> API RP 1160 is the American Petroleum Institute's recommended practice for managing the integrity of hazardous liquid pipelines. Titled Managing System Integrity for Hazardous Liquid Pipelines, it sets out a process for assessing risks and choosing ways to reduce them. The third edition dates from February 2019, reaffirmed in 2024. The US legal minimum is 49 CFR 195.452.

- Label: Fact
- Type: Explainer
- Published: 2026-11-14T11:53:52+09:00
- By: Jun Zhong
- Researched and drafted by: Beacon's AI newsroom
- Checked by: Jun Zhong on 2026-11-14
- Topics: Pipelines
- Canonical: https://beacon.winda.ai/library/api-1160/

## Why does it matter?

After a crude oil pipeline ruptured at Marshall, Michigan, in July 2010, the National Transportation Safety Board (NTSB) gave API 1160 a section of its report and weighed the operator's integrity program against it [5]. NTSB found that the operator had no procedure for corrosion and cracks that overlapped on the pipe, and that six crack-like defects, 9.3 to 51.6 inches long, had stayed in the line from a 2005 assessment until the rupture [5]. The release was estimated at 843,444 gallons of crude oil [5].

## What does API 1160 cover?

In API's 2025 catalog, RP 1160 is a risk-based framework that liquid pipeline operators use to find the threats to their lines, weigh them and act to cut the number and severity of incidents [2]. The third edition is dated February 2019 and was reaffirmed in March 2024 [2].

Its main subject is onshore line pipe; the catalog adds that stations, terminals and delivery facilities can be managed the same way [2]. API states that the third edition draws on recent experience with pipeline mechanics and takes the proactive approach of API RP 1173 on pipeline safety management systems [1]. It points readers to related API documents on leak detection (RP 1175), cracking (RP 1176), integrity data management and integration (RP 1178) and hydrotechnical hazards (RP 1133) [1].

## How does API 1160 relate to 49 CFR 195.452?

The federal rule came first. The first hazardous liquid integrity management rule was published on 1 December 2000 (65 FR 75378) for operators of 500 or more miles of pipeline [7]. Its preamble recorded that API was sponsoring an American National Standards Institute (ANSI) work group to write a consensus standard on integrity management [7]. A July 2001 notice gave the rule's effective date as 29 May 2001 and listed "API Standard 1160" among the resources for compliance workshops [6].

Today, 49 CFR 195.452 applies to hazardous liquid and carbon dioxide pipelines that could affect a high consequence area [3]. It requires operators to follow recognized industry practices unless the section says otherwise or an alternative is backed by a reliable engineering evaluation [3]. API RP 1160 is not among the documents incorporated by reference in 49 CFR 195.3, as of the eCFR text current to 22 October 2026 [4]. Since 2019, 49 CFR 195.416 has also required in-line inspection based assessments of other onshore pipe that can take the tools, first by 1 October 2029 and then at least every 10 calendar years [8].

## What must a liquid pipeline integrity management program contain?

| Element required by 49 CFR 195.452(f) | What the rule asks for [3] | Related API document named by API [1][2] |
|---|---|---|
| 1. Identify segments that could affect a high consequence area (HCA) | A process, with risk factors checked at least yearly, not exceeding 15 months | None named |
| 2. Baseline assessment plan | In-line inspection, or, where that is impracticable, pressure test, external corrosion direct assessment or other approved technology | Std 1163, In-Line Inspection Systems Qualification; its 2013 edition is required through 195.591 [2][4][12] |
| 3. Information analysis | Integrate listed data, from coating and cathodic protection surveys to crack findings, and look for links between them; storing data in a geographic information system (GIS) alone is not enough | RP 1178 [1] |
| 4. Remedial action criteria | Immediate, 60-day and 180-day repair conditions | RP 1176 for cracking [1] |
| 5. Continual assessment | Five-year intervals, not exceeding 68 months | None named |
| 6. Preventive and mitigative measures | Risk analysis, leak detection, emergency flow restricting devices | RP 1175 for leak detection [1] |
| 7. Program effectiveness | Methods to measure whether the program works | None named |
| 8. Qualified review | Results reviewed by a person qualified to evaluate them | None named |

Sources: 49 CFR 195.452 [3]; API RP 1160 announcement [1]; API 2025 catalog [2]; 49 CFR 195.3 and 195.591 [4][12]. The third column matches topics by document title only; it does not describe what each API document contains.

## How is API 1160 different from ASME B31.8S?

ASME B31.8S, Managing System Integrity of Gas Pipelines, is the gas counterpart [11]. The 2018 edition is incorporated by reference in 49 CFR 192.7 for many integrity management sections, including threat identification and repair scheduling, so its referenced parts carry legal force for gas transmission lines [9]. API RP 1160 has no such incorporation for liquid lines [4]. The rules also differ: gas segments have a maximum reassessment interval of 7 calendar years under 192.939, while liquid segments in high consequence areas use five-year intervals capped at 68 months [3][9].

## Where integrity problems show up

| Decision | Data it depends on | What goes wrong without it | In the Library |
|---|---|---|---|
| Combine corrosion and crack data | Results of different in-line inspection tools and digs | Marshall, Michigan, 2010: where corrosion had thinned the surface next to a crack, the crack tool reported a shallower crack than existed, and no procedure corrected for it [5] | [What happens after an in-line inspection run?](/library/ili-anomaly-response/) |
| Set the margin for digging cracks | Fracture mechanics results and tool tolerance | Same case: a lower safety margin was used for cracks than for corrosion; NTSB asked PHMSA to set crack assessment methods and excavation criteria (P-12-3) [5] | [How are crack-like flaws assessed for fitness-for-service?](/library/crack-like-flaw-assessment/) |
| Decide which threats drive risk | Coating, insulation and cathodic protection records | Santa Barbara County, California, 2015: PHMSA found corrosion under insulation was not listed as a risk-driving threat; progressive external corrosion of the insulated line caused the failure [10] | [What is corrosion under insulation (CUI)?](/library/corrosion-under-insulation/) |
| Judge leak detection capability | Supervisory control alarms and line balance data | Marshall, Michigan, 2010: the release went unrecognized by the control center for over 17 hours [5]; 195.452(i)(3) requires operators to evaluate leak detection [3] | [High consequence area](/glossary/high-consequence-area/) |

Sources: NTSB PAR-12/01 (2012) [5]; PHMSA failure investigation report (2016) [10]; 49 CFR 195.452 [3].

## Sources

1. [API Recommended Practice 1160, 3rd Edition (announcement page) (3rd edition), American Petroleum Institute (API)](https://www.api.org/products-and-services/standards/important-standards-announcements/recommended-practice-1160)
2. [2025 Publications Catalog (entries for RP 1160, Std 1163 and RP 1173) (RP 1160, 3rd edition, February 2019, reaffirmed March 2024; Std 1163, 3rd edition, September 2021), American Petroleum Institute (API)](https://www.api.org/-/media/files/publications/2025-catalog/2025_pubs%20catalog.pdf)
3. [49 CFR 195.452, Pipeline integrity management in high consequence areas, eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-49/section-195.452)
4. [49 CFR 195.3, What documents are incorporated by reference partly or wholly in this part?, eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-49/section-195.3)
5. [Pipeline Accident Report NTSB/PAR-12/01: Enbridge Incorporated Hazardous Liquid Pipeline Rupture and Release, Marshall, Michigan, July 25, 2010, US National Transportation Safety Board (NTSB)](https://www.ntsb.gov/investigations/AccidentReports/Reports/PAR1201.pdf), 2012-07-10
6. [Pipeline Safety: Pipeline Integrity Management in High Consequence Areas (Hazardous Liquid Operators With 500 or More Miles of Pipeline), notice of workshop, 66 FR 35319, Research and Special Programs Administration, US Department of Transportation (Federal Register)](https://www.govinfo.gov/content/pkg/FR-2001-07-03/html/01-16664.htm), 2001-07-03
7. [Pipeline Safety: Pipeline Integrity Management in High Consequence Areas (Hazardous Liquid Operators Owning or Operating 500 or More Miles of Pipeline), final rule, 65 FR 75378, Research and Special Programs Administration, US Department of Transportation (copy on PHMSA website)](https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/technical-resources/pipeline/hazardous-liquid-integrity-management/61851/implgliqpublishedfinalrule.pdf), 2000-12-01
8. [49 CFR 195.416, Pipeline assessments, eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-49/section-195.416)
9. [49 CFR 192.7 (incorporation of ASME B31.8S) and 192.939 (reassessment intervals), eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-49/section-192.939)
10. [Failure Investigation Report: Plains Pipeline, LP, Line 901, Crude Oil Release, May 19, 2015, Santa Barbara County, California, US Pipeline and Hazardous Materials Safety Administration (PHMSA)](https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/PHMSA_Failure_Investigation_Report_Plains_Pipeline_LP_Line_901_Public.pdf)
11. [B31.8S, Managing System Integrity of Gas Pipelines (product page) (2025 edition listed), American Society of Mechanical Engineers (ASME)](https://www.asme.org/codes-standards/find-codes-standards/b31-8s-managing-system-integrity-gas-pipelines)
12. [49 CFR 195.591, In-line inspection of pipelines, eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-49/section-195.591)

Published by Winda Beacon (https://beacon.winda.ai).