> API RP 580, Elements of a Risk-Based Inspection Program, sets out the minimum and recommended elements of a risk-based inspection (RBI) program. It applies to pressure-containing equipment and allows qualitative through fully quantitative risk analysis. The current 4th edition dates from August 2023, with Addendum 1 of March 2025.

- Label: Fact
- Type: Explainer
- Published: 2026-11-13T03:06:14+09:00
- Updated: 2026-11-14T15:00:00+09:00
- By: Jun Zhong
- Researched and drafted by: Beacon's AI newsroom
- Checked by: Jun Zhong on 2026-11-13
- Topics: LNG, Refining, Upstream and offshore
- Canonical: https://beacon.winda.ai/library/api-580/

## Why does it matter?

At a Richmond, California, refinery, a 2002 inspection found that one pipe component had lost about a third of its wall, but the result was kept only as a note in the inspection database; no monitoring point was added and the component was not inspected again before it ruptured on 6 August 2012 [11]. The US Chemical Safety and Hazard Investigation Board (CSB) found that readings taken on other fittings had indicated the line could run until 2016 [11]. In the weeks after the fire, about 15,000 people from nearby communities sought medical treatment [11]. Data collection, damage mechanisms and documentation are three of the ten topics API tests for its API 580 certification [2].

## What does API 580 cover?

API RP 580 is a recommended practice of the American Petroleum Institute (API). API's catalog says it sets out what an RBI program must have, and what it should have, to be set up, run and kept current; it is written for the companies that own, run or design equipment holding pressure [1]. It includes ways to assess an existing inspection program and its plan [1].

Three points define its scope [1]:

- **It sets elements, not one calculation.** Approaches from qualitative through fully quantitative can be used [1].
- **It covers fixed equipment** in refineries, petrochemical and chemical plants, and oil and gas production sites [1].
- **It has a quantitative companion.** API RP 581 supplies calculation methods; RP 580 introduces the principles and minimum general guidelines [1]. See [API 580 vs API 581: what is the difference?](/library/api-580-vs-api-581/).

The 4th edition runs to 99 pages [1] and was amended by Addendum 1 in March 2025 [2].

## What topics make up an API 580 program?

API publishes the topics its API 580 certification exam tests, based on the current edition [2]. The plain-words column below is Beacon's general explanation from public sources, not text from the standard.

| Topic in API's 2026 exam body of knowledge [2] | What it means in an RBI program |
|---|--- |
| Terms, definitions and acronyms | Shared vocabulary for the team and the records |
| Risk assessment | Combining likelihood and consequence of failure into a ranking [1] |
| RBI program | The plan that turns a risk ranking into inspection work over repeated cycles; in a 1992 national laboratory paper, each inspection and repair lowers the modeled failure probability for the next cycle [7] |
| Roles, responsibilities, training and qualifications | Who makes the judgements and what they need to know; the 1992 ASME task force method had a trained panel with structural integrity experience at operating plants estimate failure probabilities [7] |
| Data collection | Plant records checked against the plant itself, as in the walkdowns of the 1992 pilot work [7]; OSHA's 2017 review says an odd reading must be retested and explained, never discarded [9] |
| Damage mechanisms | What can degrade each item, and where |
| Probability of failure (POF) | How likely loss of containment is over a period [1] |
| Consequence of failure (COF) | What a release would do to people, plant and environment [1] |
| Risk management | Planning inspection before risk reaches a target [1] |
| RBI documentation | Keeping results and the basis of each interval on record; OSHA's 2017 review cited poorly recorded piping inspections and procedures left unchanged after a new way of changing piping intervals came in [9] |

## How did API 580 come about?

API began a risk-based inspection project in May 1993 [4]. Its calculation method came out first, as API 581 in 2000; API 580, a broader recommended practice, followed two years later [4]. A 2026 open-access study that adapted RBI to a hydrogen-fuelled glass plant took the API 580 approach as its base and called API's RBI the most established approach [8]. The 2025 catalog shows the 4th edition of RP 580, August 2023 [1].

## How is API 580 used by regulators and inspectors?

- **United States.** The process safety management (PSM) rule requires inspection procedures to follow recognized and generally accepted good engineering practice (RAGAGEP) and inspection frequency to match it [10]. In its 2017 review of refinery inspections, the Occupational Safety and Health Administration (OSHA) named API 510, API 570 and API 580 as examples of such practice for piping and vessels [9].
- **United Kingdom.** The pressure systems rules name no RBI document. A written scheme of examination, drawn up or certified by a competent person, sets the nature and frequency of examination [6], and the Health and Safety Executive (HSE) guidance on the rules lets separate parts of one system be examined at separate intervals according to the risk each carries [5].
- **People.** API certifies individuals in RBI under the API 580 program: the exam has 80 scored and 10 unscored pretest questions over 3 hours 15 minutes, closed book [2], and certification lasts three years [3]. Holders of a current API 510, 570 or 653 certificate qualify automatically; others qualify through education and petrochemical industry experience [3].

## Where integrity problems show up

| Decision | Data it depends on | What goes wrong without it |
|---|---|--- |
| Feeding inspection findings back into the plan | An inspection database that links findings to monitoring points | Richmond, 2012: wall loss found in 2002 was not entered into monitoring point tracking, and the component was not inspected again [11] |
| Choosing representative measurement points | Variation in material and damage rate within a circuit | Richmond, 2012: the line had 19 monitoring locations, most of them historically on high-silicon fittings and none on the low-silicon component that failed, so the data missed its faster corrosion [11] |
| Setting inspection frequency under a chosen practice | The selected RAGAGEP and measured corrosion rates | OSHA's 2017 review cited unacceptable or unestablished inspection frequencies under employers' selected practice, or none [9] |
| Acting on new industry knowledge | Revised guidance and material data for existing equipment | Philadelphia, 2019: new knowledge on nickel and copper in steel for acid service had not led to inspection of every existing component [12] |

Sources: CSB report on the 2012 Richmond refinery fire, 2015 [11]; CSB report 2019-04-I-PA, 2022 [12]; OSHA 3918, 2017 [9].

## Sources

1. [2025 Publications Catalog (entries for RP 580 and RP 581) (RP 580, 4th edition, August 2023), American Petroleum Institute (API)](https://www.api.org/-/media/files/publications/2025-catalog/2025_pubs%20catalog.pdf)
2. [Body of Knowledge for API 580 Risk-Based Inspection Certification Exam (2026 exams) (RP 580, 4th edition, August 2023, with Addendum 1 (March 2025)), American Petroleum Institute (API)](https://www.api.org/-/media/Files/Certification/ICP/ICP-Certification-Programs/571_577_580/2026/580_2026_BOK_final.pdf)
3. [API 580 Certification: Risk Based Inspection, American Petroleum Institute (API)](https://www.api.org/products-and-services/individual-certification-programs/certifications/api580)
4. [The implementation of a probabilistic risk based inspection approach (R. Abukharmh, master's thesis), Memorial University of Newfoundland](https://hdl.handle.net/20.500.14783/10943)
5. [Safety of pressure systems: Pressure Systems Safety Regulations 2000, Approved Code of Practice and guidance (L122, second edition), UK Health and Safety Executive (HSE)](https://www.hse.gov.uk/pubns/priced/l122.pdf)
6. [The Pressure Systems Safety Regulations 2000 (SI 2000/128), regulation 8, legislation.gov.uk, The National Archives](https://www.legislation.gov.uk/uksi/2000/128/regulation/8)
7. [Risk Based ASME Code Requirements (B. F. Gore, T. V. Vo, K. R. Balkey), PNL-SA-21211, OSTI 7129942, Pacific Northwest Laboratory, US Department of Energy, via OSTI.gov](https://www.osti.gov/servlets/purl/7129942)
8. [Toward the application of the Risk-Based Maintenance approach to a hydrogen-fueled manufacturing plant (G. Collina and others), International Journal of Hydrogen Energy 238, 155318, open access under CC BY 4.0, Elsevier, via OSTI.gov (co-authored by the US National Laboratory of the Rockies)](https://www.osti.gov/pages/servlets/purl/3364031)
9. [Process Safety Management for Petroleum Refineries: Lessons Learned from the Petroleum Refinery Process Safety Management National Emphasis Program (OSHA 3918), US Occupational Safety and Health Administration (OSHA)](https://www.osha.gov/sites/default/files/publications/OSHA3918.pdf)
10. [29 CFR 1910.119, Process safety management of highly hazardous chemicals, paragraph (j)(4), eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119)
11. [Final Investigation Report: Chevron Richmond Refinery Pipe Rupture and Fire, Report No. 2012-03-I-CA, US Chemical Safety and Hazard Investigation Board (CSB)](https://www.csb.gov/assets/1/17/Chevron_Final_Investigation_Report_2015-01-28.pdf?15397)