> API standards are consensus documents for the oil and gas industry published by the American Petroleum Institute (API), which reports more than 800. Each carries a label (Specification, Standard, Code or Recommended Practice) and a number, sits in an industry segment of API's catalog, and is developed under an American National Standards Institute (ANSI) accredited process.

- Label: Fact
- Type: Explainer
- Published: 2026-11-13T15:18:43+09:00
- By: Jun Zhong
- Researched and drafted by: Beacon's AI newsroom
- Checked by: Jun Zhong on 2026-11-13
- Topics: Pipelines, Refining, Upstream and offshore
- Canonical: https://beacon.winda.ai/library/api-standards-explained/

## Why does it matter?

Many engineers read "Recommended Practice" as optional and "Code" as law. API's 2025 procedures state that its labels set no ranking for regulatory compliance [2]. What makes a document binding is the rule or contract that adopts it: US gas pipeline operators must run public awareness programs that follow the recommendations of API RP 1162, unless they document why a provision is neither practicable nor needed for safety [9]. In refineries, the Occupational Safety and Health Administration (OSHA) names API 510, API 570 and API 580 as examples of the good engineering practice that inspection programs follow [12].

## What do Spec, Std, Code and RP mean?

API staff assign each document one of four labels, based on its content, before it is published [2].

| Label | What it is under API's procedures | Example |
|---|---|---|
| Specification (Spec) | Performance requirements for equipment and materials, written so buyers, makers and service suppliers work to the same terms | Spec 5L, line pipe: API's first standard, from 1924 [8] |
| Standard (Std) | A document that combines features of a specification and a recommended practice | Std 650, welded oil storage tanks; Std 653, tank inspection and repair |
| Code | A standard intended for adoption by regulators or other authorities having jurisdiction | API 510 and API 570, the pressure vessel and piping inspection codes |
| Recommended Practice (RP) | Describes recognized industry practice and may hold both mandatory and optional provisions | RP 571 on damage mechanisms; RP 580 and RP 581 on risk-based inspection |
| Bulletin, Technical Report (TR) | Not standards: a bulletin informs without requirements or recommendations; a TR may carry limited recommendations | Research results, one-off topics |

Sources: API Procedures for Standards Development, 2025 [2]; API 2025 catalog [3].

Inside every label the verbs carry the weight. "Shall" marks a requirement, "should" a recommendation that is advised but not required, "may" a permitted option and "can" a possibility [2]. API adds that an authority that incorporates one of its standards can make both the requirements and the recommendations mandatory [2].

## How is the API catalog organized?

API's 2025 catalog groups documents by industry segment, then by subject [3]:

- **Exploration and Production:** offshore structures, tubular goods, valves and wellhead equipment, drilling and subsea equipment. [3]
- **Petroleum Measurement:** the Manual of Petroleum Measurement Standards (MPMS), in chapters. [3]
- **Marketing and Transportation:** fuel distribution, pipeline operations and pipeline maintenance welding. [3]
- **Refining:** refinery equipment inspection, storage tanks, pressure-relieving systems, materials engineering and process safety. [3]
- **Safety and Fire Protection; Health and Environmental Issues.** [3]

The number places a document in its family; it is not a rank. Fixed-equipment inspection documents sit together in the refining chapter: API 510, API 570 and Std 653 beside a run of 570 and 580 series recommended practices [3]. Some API documents adopt International Organization for Standardization (ISO) standards; RP 2EQ, for example, takes ISO 19901-2 as its base, with changes [3].

## How are API standards made and kept current?

Committees work through subcommittees and task groups open to parties materially affected by a standard, from oil and gas companies, manufacturers and contractors to government agencies and academia [5]. A ballot passes when a majority of those eligible vote and at least two-thirds of those voting approve, not counting abstentions [2].

Each standard is reviewed at least every 5 years, then revised, reaffirmed or withdrawn; addenda and errata come between editions [2]. API answers formal requests for interpretation only on the current edition, and replies can take up to 12 months [7]. API, founded in 1919 with about 600 member companies today, gives read-only online access to nearly 200 key standards in its Incorporated by Reference (IBR) Reading Room [1][4][6]. The update cycle is covered in How are API standards updated (editions, addenda, errata)?

## Which API standards does the Library cover?

| Document | Title (short) | Edition in API's 2025 catalog | In the Library |
|---|---|---|---|
| API 510 | Pressure Vessel Inspection Code | 11th, October 2022 (Errata 1, March 2023) | [What is API 510?](/library/api-510/) |
| API 570 | Piping Inspection Code | 5th, February 2024 | What is API 570? |
| Std 653 | Tank Inspection, Repair, Alteration, and Reconstruction | 5th, November 2014, with Addenda 1 to 3 (April 2018 to November 2023) | What is API 653 (aboveground storage tank inspection)? |
| RP 572 | Inspection Practices for Pressure Vessels | 5th, November 2023 | [What is API 572 (inspection practices for pressure vessels)?](/library/api-572/) |
| RP 574 | Inspection Practices for Piping System Components | 5th, February 2024 | What is API 574 (inspection practices for piping)? |
| RP 580 | Elements of a Risk-Based Inspection Program | 4th, August 2023 | [What is API 580?](/library/api-580/) |
| RP 581 | Risk-Based Inspection Methodology | 3rd, April 2016, with Addenda 1 (April 2019) and 2 (October 2020) | What is API 581? |
| API 579-1/ASME FFS-1 | Fitness-For-Service (joint with the American Society of Mechanical Engineers, ASME) | 4th, December 2021 | [What is fitness-for-service (API 579-1/ASME FFS-1)?](/library/fitness-for-service/) |
| RP 584 | Integrity Operating Windows | 2nd, December 2021 | [What are integrity operating windows (IOWs)?](/library/integrity-operating-windows/) |
| Std 650 | Welded Tanks for Oil Storage | 13th, March 2020 (Errata 1, January 2021) | [What is API 650 (welded steel tanks for oil storage)?](/library/api-650/) |
| RP 1160 | Managing System Integrity for Hazardous Liquid Pipelines | 3rd, February 2019, reaffirmed March 2024 | What is API 1160 (integrity management for hazardous liquid pipelines)? |

Source: API 2025 Publications Catalog [3]. Comparisons: [API 510 vs API 570 vs API 653](/library/api-510-vs-api-570-vs-api-653/), [API 580 vs API 581](/library/api-580-vs-api-581/); inspector exams: [How do API 510, 570 and 653 inspector certifications work?](/library/api-inspector-certification/)

## Where integrity problems show up

| Requirement | What it means for integrity records or work | In the Library |
|---|---|---|
| 29 CFR 1910.119(j)(4)(ii) and (iii) | Inspection and test procedures and frequencies must follow recognized and generally accepted good engineering practice (RAGAGEP); OSHA's 2017 refinery review names API 510, 570 and 580 as examples and cited thickness readings and intervals that fell short of it [11][12] | What is RAGAGEP? |
| 29 CFR 1910.119(j)(4)(iv) | Each inspection or test record gives the date, inspector, equipment identifier, work done and results, whichever API document set the method [11] | [What inspection records do codes require you to keep?](/library/inspection-record-requirements/) |
| 49 CFR 195.432(b) and (c) | Atmospheric breakout tanks are inspected to API Std 653, without its risk-based internal interval option; pressurized API 2510 tanks follow section 6 of API 510 [10] | What is API 653? |
| 49 CFR 192.493 and 195.591 | In-line inspections must comply with API Std 1163 together with ANSI/ASNT ILI-PQ and NACE SP0102; the liquid rule names their requirements and recommendations [9][10] | What is in-line inspection (ILI) and pigging? |
| 49 CFR 192.225 and 192.227 | Pipeline welding procedures and welders qualify under API Std 1104 or ASME Section IX, and each procedure record is kept and followed [9] | [What are a WPS and a PQR?](/library/welding-procedure-specification/) |

Sources: eCFR 29 CFR 1910.119 [11]; OSHA 3918, 2017 [12]; eCFR 49 CFR 192 and 195 [9][10].

## Sources

1. [Standards, American Petroleum Institute (API)](https://www.api.org/products-and-services/standards)
2. [Procedures for Standards Development (8th edition, August 2025 (ANSI approved August 2025)), American Petroleum Institute (API)](https://www.api.org/-/media/Publications/API-Procedures-for-Standards-Development-2025.pdf)
3. [2025 Publications Catalog (editions as listed in the 2025 catalog), American Petroleum Institute (API)](https://www.api.org/-/media/files/publications/2025-catalog/2025_pubs%20catalog.pdf)
4. [About API, American Petroleum Institute (API)](https://www.api.org/about)
5. [Standards Committees, American Petroleum Institute (API)](https://www.api.org/products-and-services/standards/committees)
6. [IBR Reading Room, American Petroleum Institute (API)](https://www.api.org/products-and-services/standards/ibr-reading-room)
7. [Standards Requests for Interpretation Guidelines, American Petroleum Institute (API)](https://www.api.org/products-and-services/standards/standards-inquiries)
8. [Standards News Highlights (API Announces 47th Edition of Foundational Line Pipe Standard, 2 June 2026), American Petroleum Institute (API)](https://www.api.org/products-and-services/standards/important-standards-announcements), 2026-06-02
9. [49 CFR Part 192 (sections 192.7, 192.225, 192.227, 192.493, 192.616), eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-49/subtitle-B/chapter-I/subchapter-D/part-192)
10. [49 CFR Part 195 (sections 195.3, 195.432, 195.591), eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-49/subtitle-B/chapter-I/subchapter-D/part-195)
11. [29 CFR 1910.119, Process safety management of highly hazardous chemicals, eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119)