> Section VIII of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code sets the rules for building new pressure vessels. It covers materials, design, fabrication, examination, testing and certification. Division 1 applies above 15 pounds per square inch gauge (psig). The current edition is 2025.

- Label: Fact
- Type: Explainer
- Published: 2026-11-13T09:26:54+09:00
- By: Jun Zhong
- Researched and drafted by: Beacon's AI newsroom
- Checked by: Jun Zhong on 2026-11-13
- Topics: LNG, Pipelines, Refining, Upstream and offshore
- Canonical: https://beacon.winda.ai/library/asme-section-viii/

## Why does it matter?

Passing its pressure test when new does not rule out a brittle fracture later, if the vessel runs colder than it was tested [4]. A 1990 assessment by the US National Institute of Standards and Technology (NIST) explains that brittle fracture needs a crack-like flaw, high local stress (often from welds never stress relieved) and steel whose toughness has dropped with temperature [4]. Section VIII fixes those defenses before start-up, through material and impact test rules tied to a minimum design metal temperature, postweld heat treatment (PWHT) and weld examination [4][5]. Division 1 gained its present notch toughness rules only in the 1987 Addenda, so older vessels may lack them [4].

## What does ASME Section VIII cover?

Section VIII is a construction code. ASME's Division 1 page lists design, fabrication, inspection, testing and certification of fired or unfired vessels under internal or external pressure above 15 psig [1]. A 2024 review for the US Department of Energy (DOE) adds materials and overpressure protection to that list [5].

The code leans on other sections of the Boiler and Pressure Vessel Code (BPVC): Section II for material specifications, Section V for nondestructive examination and Section IX for welding qualification [4]. Relief device rules are in Section XIII, 2025 edition [3].

Three things sit outside Section VIII. It does not pick materials for a service; that falls to the owner and designer [5]. It excludes piping systems, fired process heaters and vessels below 15 psig [4]. And it has no rules for periodic inspection, fitness-for-service assessment or repair once a vessel is running [4][5].

## How do Divisions 1, 2 and 3 differ?

| | Division 1 | Division 2 | Division 3 |
|---|---|---|---|
| Full title | Rules for Construction of Pressure Vessels | Alternative Rules | Alternative Rules for Construction of High Pressure Vessels |
| Typical use | Moderate pressure and temperature, thinner walls; the most widely used division | Higher pressure and temperature or more severe duty | High pressure vessels |
| Design approach | Prescribed rules, less analysis than Division 2 | Design by detailed analysis; higher allowable design stresses, often less material | Separate rules for high pressure construction |
| ASME certification mark | U (UM for certain small vessels) | U2 | U3 |
| Covered in service by API 510 | Yes | Yes | No |

Sources: NIST SP 780, 1990 [4]; DOE PRE-L-03, 2024 [5]; ASME pages for Divisions 1 and 3, 2025 edition [1][2]; API 2025 catalog [14]; 49 CFR 192.7 [9].

## How is a Section VIII vessel certified and stamped?

ASME first reviews a manufacturer's capability and then authorizes it to build code vessels [4]. During fabrication an independent inspector confirms that material, design, fabrication and examination meet the code; the finished vessel gets the ASME certification mark and a Manufacturer's Data Report [4][5]. The nameplate records the maximum allowable working pressure (MAWP), the minimum design metal temperature (MDMT), and whether welds were radiographed and heat treated [4].

A vessel whose inspector carries a National Board commission may also be entered in the registry of the National Board of Boiler and Pressure Vessel Inspectors, a record that it was built to the ASME code and inspected by a commissioned inspector [4][6].

## Who makes Section VIII mandatory?

ASME writes the code; governments give it legal force. NIST noted in 1990 that the code had no legal standing on its own, but most US states, many cities and all Canadian provinces had adopted it in whole or in part [4]. Some current examples:

| Authority | Rule | What it requires |
|---|---|---|
| State of California | Title 8, section 460 | New vessels above 15 psig holding poisonous, corrosive or flammable substances built, inspected and stamped to the ASME code, and registered with the National Board unless UM-stamped [7] |
| US Occupational Safety and Health Administration (OSHA) | 29 CFR 1910.106(b)(1)(v) | Vessels storing flammable liquids built to Section VIII; the rule still names the 1968 edition [8] |
| OSHA | 29 CFR 1910.119(d)(3) | Process safety information lists materials and design codes, and shows equipment meets recognized and generally accepted good engineering practice (RAGAGEP) [11] |
| US Pipeline and Hazardous Materials Safety Administration (PHMSA) | 49 CFR 192.153; 195.124; 195.307(e) | Some welded pipeline components, closures and liquefied petroleum gas (LPG) breakout tank tests follow Divisions 1 or 2, 2007 edition, incorporated by reference [9][10] |

OSHA's review of its refinery inspection program named Section VIII as an example of RAGAGEP [12].

## What happens after the vessel enters service?

Section VIII stops at the certified new vessel [5]. In-service inspection, repair, alteration and rerating fall under API 510, 11th edition (2022), which covers Division 1 and 2 vessels but not Division 3, or under the National Board Inspection Code (NBIC) where a jurisdiction adopts it [6][14]. The construction data stay in use: OSHA lists the design code, MAWP, minimum design temperature, materials, corrosion allowance, PWHT and extent of weld examination among the records needed to judge an operating vessel [13].

## Where integrity problems show up

| Decision or step at this stage | What it affects later | In the Library |
|---|---|---|
| Corrosion allowance added to the wall | Damage shallower than the allowance can be removed by grinding and blending; deeper damage calls for a detailed engineering assessment [4] | [Corrosion allowance](/glossary/corrosion-allowance/), [What is fitness-for-service (API 579-1/ASME FFS-1)?](/library/fitness-for-service/) |
| Steel and impact testing chosen for the MDMT | Running colder than the design basis, with a flaw and high stress present, can cause brittle fracture even after a passed pressure test [4][5] | [Minimum design metal temperature (MDMT)](/glossary/minimum-design-metal-temperature/), What is brittle fracture? |
| Postweld heat treatment of welds | Cracking in amine, wet hydrogen sulfide, ammonia, deaerator and caustic service has concentrated at welds that were not heat treated [13] | What is post-weld heat treatment (PWHT)?, What is amine corrosion and amine cracking? |
| Extent of weld radiography | Sets the joint efficiency in the pressure calculation [5]; later limits depend on it, and in Chesapeake, Virginia, in 2008 a storage tank split open just below a fill level that assumed radiography never performed [15] | [Radiographic testing](/glossary/radiographic-testing/), What is rerating of pressure equipment? |
| Data report, nameplate and design records | Baseline for API 510 inspection, rerating and fitness-for-service; OSHA requires materials and design codes in process safety information [11][13] | What is API 510?, [API 510 vs API 570 vs API 653: which code covers which equipment?](/library/api-510-vs-api-570-vs-api-653/) |

Sources: NIST, 1990 [4]; DOE, 2024 [5]; 29 CFR 1910.119 [11]; OSHA Technical Manual [13]; US Chemical Safety and Hazard Investigation Board (CSB), 2009 [15].

## Sources

1. [BPVC.VIII.1, BPVC Section VIII, Rules for Construction of Pressure Vessels, Division 1 (product page) (2025), American Society of Mechanical Engineers (ASME)](https://www.asme.org/codes-standards/find-codes-standards/bpvc-viii-1-bpvc-section-viii-rules-construction-pressure-vessels-division-1/2025/print-book)
2. [BPVC.VIII.3, BPVC Section VIII, Rules for Construction of Pressure Vessels, Division 3, Alternative Rules for Construction of High Pressure Vessels (product page) (2025), American Society of Mechanical Engineers (ASME)](https://www.asme.org/codes-standards/find-codes-standards/bpvc-viii-3-bpvc-section-viii-rules-construction-pressure-vessels-division-3-alternative-rules-construction-high-pressure-vessels)
3. [BPVC.XIII, BPVC Section XIII, Rules for Overpressure Protection (product page) (2025), American Society of Mechanical Engineers (ASME)](https://www.asme.org/codes-standards/find-codes-standards/bpvc-xiii-bpvc-section-xiii-rules-overpressure-protection/2025)
4. [NIST Special Publication 780, Guidelines for Pressure Vessel Safety Assessment (S. Yukawa), US National Institute of Standards and Technology (NIST)](https://nvlpubs.nist.gov/nistpubs/Legacy/SP/nistspecialpublication780.pdf)
5. [PRE-L-03, Assessment of Safety Equivalency: EN 13445 and ASME B&PV Section VIII Div.1, Pressure Vessels (G. Antaki), US Department of Energy (DOE)](https://www.energy.gov/sites/default/files/2024-08/Report%20-%20EN%2013445,%20ASME%20VIII%20Div.1%20Comparison.pdf), 2024-08-12
6. [About the National Board, National Board of Boiler and Pressure Vessel Inspectors](https://www.nationalboard.org/Index.aspx?pageID=102)
7. [California Code of Regulations, Title 8, Section 460, Design and Construction of Pressure Vessels for other than Compressed Air, LPG, NH3 and Natural Gas, California Department of Industrial Relations](https://www.dir.ca.gov/title8/460.html)
8. [29 CFR 1910.106, Flammable liquids, eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.106)
9. [49 CFR 192.7, What documents are incorporated by reference partly or wholly in this part?, and 192.153, Components fabricated by welding, eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-49/subtitle-B/chapter-I/subchapter-D/part-192)
10. [49 CFR 195.3, What documents are incorporated by reference partly or wholly in this part?, 195.124, Closures, and 195.307, Pressure testing aboveground breakout tanks, eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-49/subtitle-B/chapter-I/subchapter-D/part-195)
11. [29 CFR 1910.119, Process safety management of highly hazardous chemicals, eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119)
12. [Process Safety Management for Petroleum Refineries: Lessons Learned from the Petroleum Refinery Process Safety Management National Emphasis Program (OSHA 3918), US Occupational Safety and Health Administration (OSHA)](https://www.osha.gov/Publications/OSHA3918.pdf)
13. [OSHA Technical Manual, Section IV, Chapter 3: Pressure Vessel Guidelines, US Occupational Safety and Health Administration (OSHA)](https://www.osha.gov/otm/section-4-safety-hazards/chapter-3)
14. [2025 Publications Catalog (entry for API 510, Pressure Vessel Inspection Code) (API 510, 11th edition, October 2022), American Petroleum Institute (API)](https://www.api.org/-/media/files/publications/2025-catalog/2025_pubs%20catalog.pdf)
15. [Investigation Report: Allied Terminals, Inc., Catastrophic Tank Collapse (Report No. 2009-03-I-VA), US Chemical Safety and Hazard Investigation Board (CSB)](https://www.csb.gov/allied-terminals-fertilizer-tank-collapse/)