# How is fabrication quality controlled for pressure equipment?

> Fabrication quality for pressure equipment is controlled by the maker's written quality control system and by independent checks at set steps. The checks cover incoming material, welding with qualified procedures and welders, heat treatment, nondestructive examination, dimensions and the final pressure test. For ASME code items, an Authorized Inspector certifies compliance on the manufacturer's data report.

- Label: Fact
- Type: Explainer
- Published: 2026-11-13T09:26:54+09:00
- By: Jun Zhong
- Researched and drafted by: Beacon's AI newsroom
- Checked by: Jun Zhong on 2026-11-13
- Topics: Pipelines, Refining
- Canonical: https://beacon.winda.ai/library/fabrication-quality-control/

## Why does it matter?

During 2008 and 2009 construction, several new large-diameter pipelines had girth welds fail in hydrostatic tests, leak or fail in service; the US Pipeline and Hazardous Materials Safety Administration (PHMSA) traced them to misaligned welds, improper bevels and nondestructive testing that was not set up for the joint or not done to procedure [1]. Poor control can also stay hidden for decades. The US National Transportation Safety Board (NTSB) found that inadequate quality control in 1956 let pipe with visibly defective seam welds into service at San Bruno, California, with no records of radiography or pressure testing; it ruptured 54 years later [2].

## Who controls fabrication quality?

Under the ASME Boiler and Pressure Vessel Code (BPVC), the manufacturer is responsible for meeting the code, and ASME certifies the manufacturer's quality control system before it may mark items with the ASME certification mark [3][5]. ASME has certified such systems since 1916 and listed more than 6,800 certificate holders when its page was checked in October 2026 [3]. To gain or renew a certificate, the maker's quality control manual is reviewed and the whole system, including actual welding, is demonstrated on real code work or a mock-up [4].

| Party | Role during fabrication | Source |
|---|---|---|
| Manufacturer | Runs the written quality control system; responsible for code compliance and the order | [3][5] |
| Authorized Inspector (from an Authorized Inspection Agency) | Accepts the quality control manual, inspects during construction, including against drawing dimensions, and certifies the data report | [4][5] |
| Purchaser or its source inspector | Checks against the purchase specification at points agreed in the inspection and test plan | [5] |
| Plant owner under US process safety rules | Must make sure equipment as fabricated suits the process and is installed as designed | [12] |

## What is checked during fabrication?

US nuclear quality rules, a public model for such controls, require welding, heat treating and nondestructive testing to be done by qualified people using qualified procedures [8]. ASME BPVC Section VIII, Division 1 (2025 edition) covers design, fabrication, inspection, testing and certification of vessels above 15 pounds per square inch gauge (psig), and Section IX (2025 edition) covers welding, brazing and fusing qualifications [6][7].

| Stage | What is checked | Record it leaves |
|---|---|---|
| Material receipt | Certificates against the order and specification; marking; alloy check where required | Mill test certificates, receiving record, PMI report |
| Cutting, forming, fit-up | Dimensions and tolerances on drawings, which carry the design calculations | Dimensional report [5] |
| Welding | Qualified welding procedures and qualified welders | Welding procedure and qualification records, weld map [7][8] |
| Heat treatment | Whether post-weld heat treatment (PWHT) was done, its type, extent and conditions | Time and temperature chart [9] |
| Nondestructive examination (NDE) | Method and extent, and whether done before or after PWHT and the pressure test | NDE reports; examiner qualifications [9][10] |
| Pressure test and final inspection | Test result; visual check for material and dimensional defects | Test record, nameplate, manufacturer's data report (ASME U-1 or U-2) [5][9] |

Sources: OSHA Technical Manual, Section IV, Chapter 3 [9]; National Board [5]; ASME product pages [6][7]; 10 CFR 50 Appendix B, Criterion IX [8]; NIST SP 780, 1990 [10].

## How is fabrication quality documented?

Records are the evidence that checks happened. The nuclear rule asks that inspection and test records name the inspector, the type of observation, the result, its acceptability and any action on deficiencies [8], and ASME's joint review asks to see records of all code work since the previous review [4]. OSHA's pressure vessel guidelines list what a later safety assessment needs from construction: serial number and data report, design code, material specifications, corrosion allowance, PWHT details, and the type, extent and timing of weld examinations [9]. Where such records were never made, as for the 1956 San Bruno work, nothing shows what was checked [2].

## Where integrity problems show up

| Decision or step at this stage | What it affects later | In the Library |
|---|---|---|
| Leaving welds without PWHT in amine, wet hydrogen sulfide, ammonia or deaerator service | Service cracking concentrates in or near as-welded seams; in a survey of 294 amine plants, about 40% reported cracking [9][10] | What is post-weld heat treatment (PWHT)?; What is amine corrosion and amine cracking? |
| Not post-weld heat treating carbon steel exchanger shells in hot hydrogen service | At Anacortes, Washington, in 2010, hydrogen attack was found only near non-PWHT welds, along which the shell ruptured [11] | [What is high temperature hydrogen attack (HTHA)?](/library/high-temperature-hydrogen-attack/) |
| Controlling weld hardness for wet hydrogen sulfide service | Cracks can start at small hard zones near welds that conventional hardness tests do not detect [9] | What is wet hydrogen sulfide (H2S) damage? |
| Setting up and following NDE procedures for each joint | Some girth welds that failed in service had NDE procedures that were not optimized or not completed as required [1] | [Radiographic vs ultrasonic testing for welds](/library/radiography-vs-ultrasonic/) |
| Finding flaws before the equipment leaves the shop | In a survey of 141 liquefied petroleum gas vessels, 30% had cracking, a considerable part of it preexisting fabrication flaws found by more sensitive methods [10] | How are crack-like flaws assessed for fitness-for-service? |
| Keeping construction records with the vessel | They are inputs to later safety assessment [9] | [What documents are handed over when a project is completed?](/library/handover-documentation/) |

Sources: OSHA Technical Manual, Section IV, Chapter 3 [9]; NIST SP 780, 1990 [10]; CSB Anacortes report, 2014 [11]; PHMSA Advisory Bulletin ADB-10-03, 2010 [1].

## Sources

1. [Pipeline Safety: Girth Weld Quality Issues Due to Improper Transitioning, Misalignment, and Welding Practices of Large Diameter Line Pipe (Advisory Bulletin ADB-10-03), 75 FR 14243, US Pipeline and Hazardous Materials Safety Administration (PHMSA), via Federal Register (govinfo)](https://www.govinfo.gov/content/pkg/FR-2010-03-24/html/2010-6528.htm), 2010-03-24
2. [Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire, San Bruno, California, September 9, 2010 (NTSB/PAR-11/01), US National Transportation Safety Board (NTSB)](https://www.ntsb.gov/investigations/AccidentReports/Reports/PAR1101.pdf)
3. [Boiler and Pressure Vessel Certification, American Society of Mechanical Engineers (ASME)](https://www.asme.org/certification-accreditation/boiler-and-pressure-vessel-certification)
4. [Information and Description of the ASME Joint Review Process for Applicant's Applying for ASME Boiler and Pressure Vessel Code Certification, American Society of Mechanical Engineers (ASME)](https://www.asme.org/wwwasmeorg/media/ResourceFiles/Shop/Certification-Accreditation/BPV-Certification/information-and-description-of-the-asme-joint-review-process-for-applica.pdf)
5. [The Authorized Inspector's Responsibility for Dimensional Inspection (National Board BULLETIN, Classic Series), National Board of Boiler and Pressure Vessel Inspectors](https://www.nationalboard.org/Index.aspx?pageID=164&ID=223)
6. [BPVC.VIII.1, BPVC Section VIII, Rules for Construction of Pressure Vessels, Division 1 (product page) (2025), American Society of Mechanical Engineers (ASME)](https://www.asme.org/codes-standards/find-codes-standards/bpvc-viii-1-bpvc-section-viii-rules-construction-pressure-vessels-division-1/2025/print-book)
7. [BPVC.IX, BPVC Section IX, Welding, Brazing, and Fusing Qualifications (product page) (2025), American Society of Mechanical Engineers (ASME)](https://www.asme.org/codes-standards/find-codes-standards/bpvc-ix-bpvc-section-ix-welding-brazing-fusing-qualifications/2025/print-book)
8. [10 CFR Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-10/chapter-I/part-50/appendix-Appendix%20B%20to%20Part%2050)
9. [OSHA Technical Manual, Section IV, Chapter 3: Pressure Vessel Guidelines, US Occupational Safety and Health Administration (OSHA)](https://www.osha.gov/otm/section-4-safety-hazards/chapter-3)
10. [NIST Special Publication 780, Guidelines for Pressure Vessel Safety Assessment (S. Yukawa), US National Institute of Standards and Technology (NIST)](https://nvlpubs.nist.gov/nistpubs/Legacy/SP/nistspecialpublication780.pdf)
11. [Investigation Report: Catastrophic Rupture of Heat Exchanger (Seven Fatalities), Tesoro Anacortes Refinery, Anacortes, Washington, April 2, 2010 (Report 2010-08-I-WA), US Chemical Safety and Hazard Investigation Board (CSB)](https://www.csb.gov/assets/1/6/Tesoro_Anacortes_2014-May-01.pdf?15244)
12. [29 CFR 1910.119, Process safety management of highly hazardous chemicals, eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119)