# What is a line list?

> A line list is a table with one row per numbered pipe line, recording its fluid, size, piping class, design and operating conditions and insulation. It is the register behind the line numbers shown on piping and instrumentation diagrams (P&IDs). The Capital Facilities Information Handover Specification (CFIHOS) calls it the piping line list.

- Label: Fact
- Type: Explainer
- Published: 2026-11-13T09:39:01+09:00
- By: Jun Zhong
- Researched and drafted by: Beacon's AI newsroom
- Checked by: Jun Zhong on 2026-11-13
- Topics: LNG, Refining, Upstream and offshore
- Canonical: https://beacon.winda.ai/library/line-list/

## Why does it matter?

Version 2.0 (2024) of CFIHOS lists 27 properties to record for each pipe line, from the fluid it carries to its corrosion allowance [1]. Those values also decide how piping is grouped for inspection: the US Occupational Safety and Health Administration (OSHA) uses the piping circuit definition from API 570, the American Petroleum Institute's piping inspection code: a section of piping with similar corrosivity, design conditions and materials [2]. For each circuit it samples at a refinery, OSHA looks for the installation date, material specifications, original thickness, later thickness readings, retirement thickness and service class [2].

## What does a line list record?

CFIHOS defines the piping line list as an authoritative collection of values about piping, with specified and controlled columns [1]. Its data dictionary gives the pipe, which it also calls a line, the properties grouped below. CFIHOS describes its requirements as minimum data standards for asset information [9]; company line lists can carry more.

| Group | Properties CFIHOS defines for a pipe line |
|---|---|
| Service | Fluid name, service code and the design specification that applies |
| Size and wall | Nominal diameter and nominal wall thickness |
| Material | Piping class, material specification and corrosion allowance |
| Design envelope | Upper and lower design pressure; upper and lower design temperature |
| Operating conditions | Normal operating pressure, temperature and flow, with upper and lower operating limits |
| Insulation and tracing | Insulation code, type and thickness; heat tracing temperature |
| Coating | External coating specification and paint code |
| Examination | Nondestructive testing methods |

Source: CFIHOS Core Reference Data Library V2.0, tag class "pipe", 2024 [1]. Grouping is Beacon's.

## How does the line list relate to the P&ID and the piping class?

A P&ID shows each process line with its size and identification [7]; the line list holds the rest of that line's data [1]. The piping class in each row points to a piping specification, which CFIHOS treats as a specialized design specification for piping [1]. Where the class changes, a material selection diagram, usually drawn as a layer on the process flow diagram (PFD) or P&ID, can show the break, for example from carbon steel to stainless steel [1].

Class breaks are where the material is easiest to get wrong. At a Texas City, Texas, refinery, the piping specification called for 1.25% chromium low-alloy steel in hot hydrogen service, while hydrogen piping below 450 °F (about 232 °C) could be carbon steel [5]. In 2005, a carbon steel elbow was installed by mistake in a hot position during maintenance and ruptured after about three months from high temperature hydrogen attack (HTHA) [5].

## Who uses the line list during design and construction?

The line list supplies the inputs for several design tasks. CFIHOS describes a piping stress calculation as working out how a pipe behaves from its material, pressure, temperature, fluid and supports [1], most of which sit in the line's row. The same rows hold each line's insulation, coating and examination data [1]. The [piping isometric](/library/piping-isometric/) for a line carries its bill of materials [1].

At handover the list becomes plant information. In US plants under OSHA's process safety standard, materials of construction and the design codes and standards used are required process safety information [8].

## How is the line list used to set corrosion loops and inspection?

Inspection planning groups lines that share a corrosion environment. OSHA quotes API 570's definition of a circuit as piping with similar corrosivity, design conditions and construction materials [2], and the US Chemical Safety and Hazard Investigation Board (CSB) describes circuits as sections with similar process conditions, the same material and the same expected damage mechanisms [4]. Fluid, design conditions and material are line list columns [1]. CFIHOS also lists corrosion loop diagrams, showing loop boundaries, as part of the material selection diagram [1].

Inside each circuit, inspectors set condition monitoring locations (CMLs). OSHA cites API 570 as calling for CMLs at injection points, mixing points and dead legs, not only along the run of pipe [3]. A dead leg is a section of piping that stays connected to the process but carries no flow; at Sunray, Texas, in 2007, an idle control station formed one that the refinery had not identified, and water in it froze and cracked an elbow [6].

## Where integrity problems show up

| Decision or step at this stage | What it affects later | In the Library |
|---|---|---|
| Fluid, design conditions and material are recorded for each line | Lines with similar corrosivity, design conditions and materials are grouped into circuits for inspection [2][4] | [What is a corrosion loop?](/library/corrosion-loop/), [Corrosion circuit](/glossary/corrosion-circuit/) |
| A piping class and its class breaks are set | At Texas City (2005), a carbon steel elbow in a line that required low-alloy steel ruptured after about three months [5] | What is positive material identification (PMI)?, [What is high temperature hydrogen attack (HTHA)?](/library/high-temperature-hydrogen-attack/) |
| Nominal wall thickness and corrosion allowance are recorded | OSHA looks for the original thickness and the retirement thickness of each sampled circuit [2] | [Corrosion allowance](/glossary/corrosion-allowance/), [Minimum required thickness](/glossary/minimum-required-thickness/) |
| Insulation type and thickness are recorded | OSHA found corrosion under insulation a common non-compliant condition in refinery inspections [3] | [What is corrosion under insulation (CUI)?](/library/corrosion-under-insulation/) |
| Lines with no normal flow, and injection points, are identified | OSHA cites API 570 for CMLs at dead legs, injection points and mixing points [3]; at Sunray (2007), an unidentified dead leg froze and cracked [6] | [Dead leg](/glossary/dead-leg/), [Injection point](/glossary/injection-point/), What are condition monitoring locations (CMLs)? |

Sources: CFIHOS V2.0, 2024 [1]; OSHA CPL 03-00-004, 2007 [2]; OSHA 3918, 2017 [3]; CSB report on Philadelphia, 2022 [4]; CSB safety bulletin on Texas City, 2006 [5]; CSB report on Sunray, 2008 [6].

## Sources

1. [CFIHOS Core Reference Data Library (C-ST-001): document types, tag class 'pipe' properties (V2.0), IOGP JIP36, Capital Facilities Information Handover Specification (CFIHOS)](https://www.jip36-cfihos.org/wp-content/uploads/2024/10/CORE-CFIHOS-V2.0-excel-FINAL.xlsx), 2024-11-01
2. [CPL 03-00-004, Petroleum Refinery Process Safety Management National Emphasis Program, US Occupational Safety and Health Administration (OSHA)](https://www.osha.gov/enforcement/directives/cpl-03-00-004), 2007-06-07
3. [Process Safety Management for Petroleum Refineries: Lessons Learned from the Petroleum Refinery Process Safety Management National Emphasis Program (OSHA 3918-08), US Occupational Safety and Health Administration (OSHA)](https://www.osha.gov/Publications/OSHA3918.pdf)
4. [Fire and Explosions at Philadelphia Energy Solutions Refinery Hydrofluoric Acid Alkylation Unit, Philadelphia, Pennsylvania (Investigation Report No. 2019-04-I-PA), US Chemical Safety and Hazard Investigation Board (CSB)](https://www.csb.gov/assets/1/20/PES_Final_Report_Published_October_2022_r1.pdf?16845), 2022-10-11
5. [Safety Bulletin No. 2005-04-B: BP Texas City, TX Refinery Fire. Positive Material Verification: Prevent Errors During Alloy Steel Systems Maintenance, US Chemical Safety and Hazard Investigation Board (CSB)](https://csb.gov/assets/1/6/positive_materials_identification_safety_bulletin_(october_2006).pdf), 2006-10-12
6. [Investigation Report: LPG Fire at Valero McKee Refinery, Sunray, Texas (Report No. 2007-05-I-TX), US Chemical Safety and Hazard Investigation Board (CSB)](https://www.csb.gov/assets/1/20/CSBFinalReportValeroSunray.pdf?13739)
7. [Chemical Process Dynamics and Controls, 4.1: P&ID General Information (P. Woolf et al., University of Michigan), LibreTexts Engineering (CC BY 3.0)](https://eng.libretexts.org/Bookshelves/Industrial_and_Systems_Engineering/Chemical_Process_Dynamics_and_Controls_(Woolf)/04%3A_Piping_and_Instrumentation_Diagrams/4.01%3A_PandID_General_Information)
8. [29 CFR 1910.119, Process safety management of highly hazardous chemicals, eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119)
9. [About CFIHOS, IOGP JIP36, CFIHOS](https://www.jip36-cfihos.org/about/)

Published by Winda Beacon (https://beacon.winda.ai).