# Who does what on an oil and gas project: operator, EPC contractor, licensor and vendor?

> On an oil and gas project, the owner or operator sets requirements and runs the asset, while others design, build and inspect it. A licensor supplies the process design, an engineering, procurement and construction (EPC) contractor delivers the plant and vendors fabricate equipment. In US process plants, 29 CFR 1910.119 places mechanical integrity duties on the operating employer.

- Label: Fact
- Type: Explainer
- Published: 2026-11-13T15:24:40+09:00
- By: Jun Zhong
- Researched and drafted by: Beacon's AI newsroom
- Checked by: Jun Zhong on 2026-11-13
- Canonical: https://beacon.winda.ai/library/operator-epc-vendor-roles/

## What does the owner or operator do?

The owner pays for the asset and decides what it must deliver. On many oil and gas projects the owner is a project company held by several joint venture partners, and one of them, the operator, runs it for all of them under a joint operating agreement [1].

Regulators define the operator by control rather than ownership. The International Association of Drilling Contractors (IADC) glossary of regulatory definitions shows US offshore rules, the European Union offshore safety directive 2013/30/EU and several national laws tying the term to the party a licensee or lessee appoints to run operations [3]. For US gas pipelines, a 1974 PHMSA interpretation of 49 CFR 192.3 reads "operator" as whoever physically controls the facilities, whether or not it owns the gas [4].

The owner also leads front-end engineering design (FEED) and sets how much risk the project can carry [2]. In US plants covered by process safety management (PSM), the operating employer must vet a contractor's safety record, brief contract workers on fire, explosion and toxic release hazards, control their access and review their performance, under 29 CFR 1910.119(h) [5].

## What does an EPC contractor do?

Under an engineering, procurement and construction contract, one contractor designs the facility, buys the equipment and materials, builds it, then commissions and tests it. The owner therefore has a single party to look to for problems and compensation [1]. Because the plant is handed over ready to start, these contracts are also called turnkey contracts [1].

PwC's 2016 guide describes three commitments that define the EPC model: a guaranteed price, a guaranteed completion date and a specified performance level. Missing the date or the performance level usually triggers liquidated damages, which are amounts agreed in advance, and the contractor normally corrects defects for 12 to 24 months after performance testing [1].

Owners can also split the work: PwC lists engineering, procurement and construction management (EPCM), separate supply, design and construction contracts, and "split EPC", which divides the scope into, for example, a local construction contract and a foreign supply contract. PwC notes split EPC is common in the Middle East and South Asia, usually for tax or licensing reasons [1].

## What does a process licensor provide?

When a unit runs on licensed process technology, the licensor, or technology designer, supplies the technology package. A 2017 paper at the American Institute of Chemical Engineers (AIChE) annual meeting describes this package as built around an extended process design package (PDP), with a design team kept available to support the owner and the EPC contractor through engineering, construction and commissioning [2].

The resulting design data must end up with the operator: under 29 CFR 1910.119(d)(3), the employer must hold equipment information including materials of construction, [piping and instrumentation diagrams (P&IDs)](/library/piping-and-instrumentation-diagram/), electrical classification, relief system design, ventilation design and the design codes and standards used [5].

## Where do vendors and fabricators fit?

When equipment bought from vendors and fabricators ([procurement](/library/procurement-in-oil-and-gas/)) is pressure equipment built to an ASME standard, an Authorized Inspection Agency (AIA) accredited by ASME inspects it while it is being made [6].

The purchaser keeps a duty of its own: 29 CFR 1910.119(j)(6) requires the employer to make sure equipment is suitable for the process as it is fabricated, to check that it is installed properly, and to confirm that spare parts and maintenance materials suit the process [5].

## Who inspects and certifies the equipment?

Inspection duties change hands over the asset's life [6][5][7]; for the certification of individual inspectors, see [API inspector certification](/library/api-inspector-certification/).

- **During manufacture:** ASME-accredited AIAs inspect code pressure equipment in the shop [6].
- **In service:** the operating employer inspects and tests process equipment following recognized and generally accepted good engineering practice (RAGAGEP), records each inspection (date, inspector, equipment, results), and corrects deficiencies before further use or manages them safely until corrected, under 29 CFR 1910.119(j)(4) and (j)(5) [5].
- **Repairs and alterations:** National Board document NB-415 (revision 8, approved 10 May 2025) sets how a repair organization earns the "R" Certificate of Authorization: a quality system meeting the National Board Inspection Code (NBIC), normally an inspection agreement with an AIA, and a review usually led by the local jurisdiction. Certificates run for three years [7].

## Where integrity problems show up

| Stage and party | Integrity issue that can start there | In the Library |
|---|---|---|
| Design and material selection (licensor, EPC engineering) | A material that does not resist the service, for example carbon steel where hot hydrogen calls for chrome alloy steel | [What is high temperature hydrogen attack (HTHA)?](/library/high-temperature-hydrogen-attack/), [How are materials selected for oil and gas equipment?](/library/material-selection/) |
| Fabrication and supply (vendors) | Equipment or spare parts not suited to the process | [What is material traceability?](/library/material-traceability/), [What is a mill test certificate (EN 10204 3.1 and 3.2)?](/library/mill-test-certificate/) |
| Construction (EPC or construction contractor) | Equipment not installed properly | [What is an inspection and test plan (ITP)?](/library/inspection-and-test-plan/), [What is mechanical completion?](/library/mechanical-completion/) |
| Handover (EPC contractor to owner) | Missing records on materials of construction, P&IDs, relief design and design codes | [What documents are handed over when a project is completed?](/library/handover-documentation/) |
| Maintenance (contractors during operation) | A look-alike carbon steel elbow swapped in for an alloy one during an exchanger overhaul; it failed by HTHA after a few thousand hours | What is positive material identification (PMI)? |
| Operation (operator) | Equipment found outside acceptable limits at inspection | What is mechanical integrity (MI)?, [What should an inspection plan contain?](/library/inspection-plan/) |
| Repairs (repair organizations) | Repairs and alterations to pressure equipment done outside an accredited quality system | [What is the National Board Inspection Code (NBIC)?](/library/national-board-inspection-code/) |

Sources: 29 CFR 1910.119(d)(3), (j)(5), (j)(6) [5]; CSB Safety Bulletin 2005-04-B on a 2005 refinery hydrotreater fire, 2006 [8]; National Board NB-415, 2025 [7].

## Sources

1. [EPC Contracts in the oil and gas sector (Investing in Infrastructure series), PwC Australia (legal)](https://www.pwc.com.au/legal/assets/investing-in-infrastructure/iif-5-epc-contracts-oil-gas-feb16-2.pdf)
2. [Risk Mitigation in Technology Commercialization: Responsibilities of the Owner, Designer and EPC Contractor (K. Drumm), AIChE Annual Meeting, American Institute of Chemical Engineers (AIChE)](https://proceedings.aiche.org/conferences/aiche-annual-meeting/2017/proceeding/paper/91d-risk-mitigation-technology-commercialization-responsibilities-owner-designer-and-epc-contractor)
3. [IADC Lexicon: Operator, International Association of Drilling Contractors (IADC)](https://iadclexicon.org/?p=529)
4. [Interpretation Response PI-74-0121 (49 CFR 192.3, Operator), Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety](https://www.phmsa.dot.gov/node/44701), 1974-05-31
5. [29 CFR 1910.119, Process safety management of highly hazardous chemicals, Electronic Code of Federal Regulations (eCFR)](https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119)
6. [Authorized Inspection Agency Accreditation, ASME](https://Asme.org/certification-accreditation/Authorized-Inspection-Agency-Accreditation)
7. [NB-415, Accreditation of Repair Organizations, Revision 8, The National Board of Boiler and Pressure Vessel Inspectors](https://www.nationalboard.org/SiteDocuments/Stamps and Marks/NB-415.pdf)
8. [Safety Bulletin No. 2005-04-B, Positive Material Verification: Prevent Errors During Alloy Steel Systems Maintenance, US Chemical Safety and Hazard Investigation Board (CSB)](https://www.csb.gov/assets/1/20/RHUBulletin.pdf), 2006-10-12

Published by Winda Beacon (https://beacon.winda.ai).