# What is a piping and instrumentation diagram (P&ID)?

> A piping and instrumentation diagram (P&ID) is a schematic of a process unit showing its equipment, piping, valves and instruments and how they connect. It also shows control loops and safety devices such as relief valves, but it is not drawn to scale. US process safety rules, 29 CFR 1910.119(d)(3), list P&IDs as required equipment information.

- Label: Fact
- Type: Explainer
- Published: 2026-11-13T09:44:04+09:00
- By: Jun Zhong
- Researched and drafted by: Beacon's AI newsroom
- Checked by: Jun Zhong on 2026-11-13
- Canonical: https://beacon.winda.ai/library/piping-and-instrumentation-diagram/

## Why does it matter?

The US Occupational Safety and Health Administration (OSHA) inspected refineries under a national emphasis program from 2007 and found that many did not keep accurate, complete and up-to-date P&IDs [1]. OSHA warned that a wrong P&ID can mislead engineers and operators during hazard analysis, when procedures and work permits are written, when equipment is installed and when a problem is traced [1]. Inspectors also found equipment tags that did not match the drawings and sites whose P&IDs used different notation [1].

## What does a P&ID show, and what does it leave out?

A P&ID records the topology of a unit: which equipment, lines, valves and instruments exist and how they are joined [4]. OSHA's guidance describes it as the drawing that shows how equipment and instrumentation relate, and that presents process information for piping designers and engineering staff [2]. Some companies call it a process engineering flow scheme (PEFS) [4].

| Usually shown on a P&ID | Usually not shown on a P&ID |
|---|---|
| Each item of equipment with its tag and key specifications, such as material and working pressure and temperature | Plant layout, distances between items and elevations |
| Every process line, including minor lines, with its size and identification | The routed path of each pipe and its fabrication detail |
| All valves and their types, including control, isolation and relief valves | Stream flow rates and compositions |
| Instruments, controllers and how control loops are built | Relative size of equipment |
| Vents, drains, sample connections, start-up and flush lines, and flow direction | Long written explanations |
| Where piping classes change and where vendor packages begin | Exact valve positions on the equipment |

Sources: university process control text [3]; CFIHOS document type definitions [4]; 29 CFR 1910.119, Appendix C [2].

## How do you read a P&ID?

Lines carry flow arrows and references to the next sheet, so a unit is followed across a set of drawings [3]. Symbols and tag numbers follow the notation the company adopts. OSHA's 2017 report gave the International Society of Automation (ISA) standard ANSI/ISA-S5.1 as an example notation system and Process Industry Practices (PIP) PIC001, April 2008, as an example for P&ID format and content [1].

The current ISA edition is ANSI/ISA-5.1-2024, Instrumentation and Control: Symbols and Identification, which sets a uniform way to show and identify instruments and their functions [5]. ISO 10628-1:2014 from the International Organization for Standardization covers how flow diagrams for the chemical and petrochemical industry are classified, what they contain and how they are drawn [6]. Because content differs between sites, OSHA expects employees to know what their own P&IDs contain, and its inspectors ask for the P&ID legend sheets with the drawings [1][7].

## Who uses P&IDs, and when?

| Stage | How the P&ID is used |
|---|---|
| Design | Basis for equipment and piping design, cost estimates and purchasing, and for control philosophy and programming [3] |
| Hazard review | Reference for the process hazard analysis team, which an inaccurate P&ID can mislead [1]; see [hazard and operability study (HAZOP)](/library/hazop/) |
| Before start-up | Completed, together with operating procedures and operator training, before a new process starts [2] |
| Operation and maintenance | Basis for procedures, work permits, equipment installation and troubleshooting [1] |
| Change | Updated through management of change (MOC) when a change alters it [2] |

## How are P&IDs kept accurate after start-up?

Under 29 CFR 1910.119(l)(4), a change covered by MOC that alters process safety information, which includes P&IDs, requires that information to be updated [2]. OSHA's Appendix C adds that changes made during a turnaround go through MOC and that P&IDs are updated as needed before start-up [2]. The refinery program directive tells inspectors to take one P&ID into the unit and check that the installed equipment matches it [7]. OSHA reported that P&ID deficiencies were often systemic and could point to weak MOC [1].

Investigations show what happens when this slips. At Geismar, Louisiana, a 2001 hazard review found that P&IDs did not show newly added reboiler valves; the US Chemical Safety and Hazard Investigation Board (CSB) said the update belonged in MOC and that the pre-startup safety review (PSSR) should have checked a marked-up P&ID [8]. At Sunray, Texas, a 2006 P&ID update identified only dead legs that were visible, such as removed valves, and missed one formed by closed block valves [9].

## Where integrity problems show up

| Decision or step at this stage | What it affects later | In the Library |
|---|---|---|
| Valves are added without the P&ID being updated through MOC and checked at PSSR | Hazard reviews and start-up checks work from a drawing that does not show the change; at Geismar, Louisiana (2013), a reboiler isolated from its relief device ruptured, with two fatalities [8] | What is management of change (MOC)?, [What is a pre-startup safety review (PSSR)?](/library/pre-startup-safety-review/) |
| An idle branch closed off by valves is not identified as a dead leg | At Sunray, Texas (2007), water collected, froze and cracked an elbow; released propane ignited [9] | [Dead leg](/glossary/dead-leg/) |
| Injection points are shown on the P&ID | OSHA's refinery program picks injection points from the P&IDs and checks how thickness measurement locations are set there [7] | [Injection point](/glossary/injection-point/), What are condition monitoring locations (CMLs)? |
| Material choices and piping class breaks are drawn on a material selection layer of the P&ID or PFD | The same layer can carry the corrosion loop boundaries [4] | [What is a corrosion loop?](/library/corrosion-loop/), How are materials selected for oil and gas equipment? |
| Equipment tags on the drawing match the tags in the field | OSHA found mismatched tags and mixed notation that can cause confusion during maintenance and repair [1] | [What is an asset register and what data should it hold?](/library/asset-register/) |

Sources: CSB case study on Geismar, 2016 [8]; CSB report on Sunray, 2008 [9]; OSHA CPL 03-00-004, 2007 [7]; OSHA 3918, 2017 [1]; CFIHOS V2.0, 2024 [4].

## Sources

1. [Process Safety Management for Petroleum Refineries: Lessons Learned from the Petroleum Refinery Process Safety Management National Emphasis Program (OSHA 3918-08), US Occupational Safety and Health Administration (OSHA)](https://www.osha.gov/Publications/OSHA3918.pdf)
2. [29 CFR 1910.119, Process safety management of highly hazardous chemicals (including Appendix C), eCFR, US Office of the Federal Register](https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119)
3. [Chemical Process Dynamics and Controls, 4.1: P&ID General Information (P. Woolf et al., University of Michigan), LibreTexts Engineering (CC BY 3.0)](https://eng.libretexts.org/Bookshelves/Industrial_and_Systems_Engineering/Chemical_Process_Dynamics_and_Controls_(Woolf)/04%3A_Piping_and_Instrumentation_Diagrams/4.01%3A_PandID_General_Information)
4. [CFIHOS Core Reference Data Library (C-ST-001), document type list (V2.0), IOGP JIP36, Capital Facilities Information Handover Specification (CFIHOS)](https://www.jip36-cfihos.org/wp-content/uploads/2024/10/CORE-CFIHOS-V2.0-excel-FINAL.xlsx), 2024-11-01
5. [ISA-5 Standards (ANSI/ISA-5.1-2024, Instrumentation and Control: Symbols and Identification) (ANSI/ISA-5.1-2024), International Society of Automation (ISA)](https://www.isa.org/standards-and-publications/isa-standards/isa-5-standard)
6. [ISO 10628-1:2014, Diagrams for the chemical and petrochemical industry, Part 1: Specification of diagrams (2014), International Organization for Standardization (ISO)](https://www.iso.org/standard/51840.html)
7. [CPL 03-00-004, Petroleum Refinery Process Safety Management National Emphasis Program, US Occupational Safety and Health Administration (OSHA)](https://www.osha.gov/enforcement/directives/cpl-03-00-004), 2007-06-07
8. [Williams Geismar Olefins Plant Reboiler Rupture and Fire, Geismar, Louisiana (Case Study No. 2013-03-I-LA), US Chemical Safety and Hazard Investigation Board (CSB)](https://www.csb.gov/assets/1/6/Williams_Case_Study_2016-10-19.pdf?15713)
9. [Investigation Report: LPG Fire at Valero McKee Refinery, Sunray, Texas (Report No. 2007-05-I-TX), US Chemical Safety and Hazard Investigation Board (CSB)](https://www.csb.gov/assets/1/20/CSBFinalReportValeroSunray.pdf?13739)

Published by Winda Beacon (https://beacon.winda.ai).