Crude PipelineMonitoring
Baku-Tbilisi-Ceyhan Pipeline
The 1,768 kilometre BP-operated crude pipeline carrying Azeri and Kazakh barrels from Baku to the Mediterranean at Ceyhan.
Record verified against census 2026-10: bp Azerbaijan; RFE/RL. Tracked since 2026-09.
From the public record
- 2006-05-28
First BTC crude reaches Ceyhan. Oil injected at Sangachal in May 2005 reached the Ceyhan terminal; first tanker sailed June 4.
- 2006-07
BTC export system inaugurated at Ceyhan. Ceremony with the presidents of Turkey, Azerbaijan and Georgia; bp operates the line.
Beacon coverage 0
No pieces yet.