Crude PipelineMonitoring
Forties Pipeline System
A principal UK North Sea liquids artery landing at Cruden Bay and processed at Grangemouth, operated by INEOS since 2017.
Record verified against census 2026-10: Ineos FPS media updates; OGJ. Tracked since 2026-09.
From the public record
- 2017-10-31
Ineos completes purchase of FPS from bp. Forties Pipeline System and Kinneil terminal change hands.
- 2017-12-11
Controlled shutdown over Red Moss crack. Hairline crack near Netherley grew from 106 mm to 155 mm despite pressure reduction; line offline about 17 days.
Beacon coverage 0
No pieces yet.