Crude PipelineMonitoring
Trans-Alaska Pipeline System
The 800-mile crude line from Prudhoe Bay to the Valdez Marine Terminal, in service since 1977.
Record verified against public record. Tracked since 2026-09.
From the public record
- 1977-06-20
First oil flows through the Trans-Alaska Pipeline. 800 miles from Prudhoe Bay to Valdez enter service.
Beacon coverage 0
No pieces yet.