Skip to content
Beaconby Winda
Crude PipelineMonitoring

Trans-Alaska Pipeline System

The 800-mile crude line from Prudhoe Bay to the Valdez Marine Terminal, in service since 1977.

Record verified against public record. Tracked since 2026-09.

From the public record

  1. 1977-06-20

    First oil flows through the Trans-Alaska Pipeline. 800 miles from Prudhoe Bay to Valdez enter service.

Beacon coverage 0

No pieces yet.