Skip to content
Beaconby Winda
Crude PipelineMonitoring

Vaca Muerta Oil Sur (VMOS) Pipeline

437 km, 30-inch crude export line from Allen, Río Negro to a new terminal at Punta Colorada on the Atlantic, built by a YPF-led consortium. Start-up planned Q4 2026 at ~180,000 b/d, ~550,000 b/d in 2027.

Record verified against census 2026-10: Techint VMOS page https://www.techint.com/en/our-projects/vmos; GEM wiki; Minuto Neuquén 2026-09-29. Tracked since 2026-10.

Beacon coverage 0

No pieces yet.