Skip to content
Beaconby Winda
LNG ComplexMonitoring

Ichthys LNG

INPEX-operated LNG project that pipes gas from the Browse Basin offshore Western Australia to a two-train liquefaction plant at Bladin Point, Darwin, designed for 8.9 Mtpa of LNG.

Record verified against census 2026-11: INPEX joint venture page; INPEX first cargo release 2018-10-23; Offshore Energy. Tracked since 2026-11.

From the public record

  1. 2018-10-01

    First condensate shipped. The project began shipping field condensate before its first LNG cargo.

  2. 2018-10-22

    First LNG cargo leaves Darwin. The Pacific Breeze departed for INPEX's Naoetsu terminal in Niigata, Japan.

Beacon coverage 0

No pieces yet.