Inspection effectiveness
Inspection effectiveness is how well an inspection, with its method and its coverage, can find and size the damage it is looking for.
By Jun Zhong, Editor·Researched and drafted by Beacon's AI newsroom·Checked by Jun Zhong, Editor·Last checked
A 2003 study for the US offshore regulator notes that inspection technologies are typically ranked by how effective they are at detecting, locating and sizing damage 2. In risk-based inspection the term matters because it decides how much confidence an inspection adds; API RP 581 contains calculations for it, which the US Chemical Safety and Hazard Investigation Board (CSB) describes as non-mandatory 1.
An inspection that cannot see the damage adds little, however often it is repeated. Three official cases show it 3,4,1:
- Wrong place. At a UK refinery, a relief line was thickness-tested at four points and ruptured at a thinned area between them. The UK Health and Safety Executive (HSE) says spot ultrasonic readings are not enough for high-risk dead legs 3.
- Wrong component. At Richmond, California, in 2012, no thickness monitoring point sat on the low-silicon pipe component that failed. CSB found that every component in such a circuit has to be inspected to find the ones that corrode fast 4.
- Damage the method cannot find reliably. After the 2010 Anacortes rupture, CSB concluded that inspection for high temperature hydrogen attack is not sufficiently reliable 1.
See alsoProbability of detection (POD)Damage factorDead leg
Sources
- 1.Investigation Report: Catastrophic Rupture of Heat Exchanger (Seven Fatalities), Tesoro Anacortes Refinery, Anacortes, Washington, April 2, 2010, Report 2010-08-I-WA · US Chemical Safety and Hazard Investigation Board (CSB)
- 2.Evaluation of Methods for Detecting and Monitoring of Corrosion and Fatigue Damage in Risers, Final Report, TAP Project 433 · US Minerals Management Service, now Bureau of Safety and Environmental Enforcement (BSEE) ·
- 3.Catastrophic rupture of dead-leg pipe-work (Safety alert, Bulletin No. CEMHD2-2019) · UK Health and Safety Executive (HSE) ·
- 4.Final Investigation Report: Chevron Richmond Refinery Pipe Rupture and Fire, Report 2012-03-I-CA · US Chemical Safety and Hazard Investigation Board (CSB)