What does design life mean for oil and gas equipment?
Design life is the period over which equipment is designed to operate safely under stated conditions. Designers use it to size margins such as corrosion allowance and fatigue life. It is not an expiry date: service life is how long equipment actually runs, and remaining life is estimated from its measured condition.
By Jun Zhong, Editor·Researched and drafted by Beacon's AI newsroom·Checked by Jun Zhong, Editor·Last checked ·Next review
Why does it matter?
Reaching design life does not mean equipment is worn out, and equipment can degrade well before it. The UK Health and Safety Executive (HSE) puts it this way in its research report on plant ageing: "ageing is not about how old the equipment is, but is about what is known about its condition" 1. Ageing shows up in accident data: an analysis commissioned by HSE estimated that 96 loss-of-containment major accidents reported in the European Union's major accident database between 1980 and 2006, about 28% of those reported, were related to ageing plant 2,3.
How is design life chosen, and what does it set?
Design life sets margins. HSE's plant design guidance expects equipment to cope with the temperatures and pressures it can foreseeably meet throughout the plant's life 4, and its materials guidance describes the usual approach of choosing a material that corrodes slowly at a known rate and adding thickness for that loss 5.
Illustrative numbers, not from any real asset or standard table
A simple example shows the link. Illustrative numbers, not from any real asset or standard table: if a design expects 0.1 mm of wall loss per year and has a 20-year design life, the corrosion allowance must cover at least 2 mm. If the real rate turns out to be 0.2 mm per year, that allowance is used up in about 10 years.
How is design life different from service life and remaining life?
| Term | What it describes | Set or estimated by | Does it change? |
|---|---|---|---|
| Remaining life | Time left before the equipment reaches a limit, such as its minimum required thickness | Engineering estimate from measured condition and damage rate 6 | Re-estimated after each inspection |
| Fitness-for-service result | Whether damaged equipment can keep running, and under what limits | Assessment when damage is found; outcomes include continued service, rerating, repair or scrapping 1 | New result for each assessment |
For wall loss, remaining life is projected from the metal still available above the minimum required thickness and the measured corrosion rate. The US Chemical Safety and Hazard Investigation Board (CSB) describes minimum required thickness as the lowest thickness that still withstands the pressure and structural loads on the pipe, and its 2015 refinery report shows how the value chosen changes the projected remaining life 6. See What is fitness-for-service (API 579-1/ASME FFS-1)?.
What happens when equipment reaches its design life?
It is assessed, not automatically retired 1. HSE's ageing report lists the options once inspection shows ageing: justify continued service, re-rate, repair or scrap 1.
In the UK, HSE inspected how ageing and life extension were managed, onshore and offshore, from 2011 to 2013 under its Key Programme 4, and treats ageing as a key risk to asset integrity 7.
Where integrity problems show up
| Decision or step at this stage | What it affects later | In the Library |
|---|---|---|
| Assuming a corrosion rate at design | Remaining life shrinks faster when actual rates are higher; OSHA cited refineries where this went uncorrected 8 | Corrosion rate and remaining life calculator |
Sources: OSHA 3918, 2017 8.
Common questions
- Can equipment be used beyond its design life?
- Yes, if an assessment shows it is still fit for service. HSE lists continued service, rerating, repair and scrapping as the outcomes of an ageing assessment, and Norway requires regulator consent before an offshore installation runs past its original design life.
- What is the difference between design life and remaining life?
- Design life is an assumption made before the equipment exists. Remaining life is an estimate made from inspection data at a given date, and it can be longer or shorter than the design life left on paper.
Beacon explains these concepts in its own words for education. It does not reproduce or replace the standards cited, and Winda is not affiliated with or endorsed by the organizations that publish them. Engineering decisions need the current edition of the standard and a qualified engineer.
Sources
- 1.RR509, Plant ageing: Management of equipment containing hazardous fluids or pressure (research report summary page) · UK Health and Safety Executive (HSE)
- 2.The Importance of Recognising and Managing Ageing Plant (D. Mansfield, T. Atkinson, J. Worsley), IChemE Symposium Series No. 158, Hazards XXIII · Institution of Chemical Engineers (IChemE)
- 3.Regulatory Inspection of Ageing Assets (I. Redshaw, HSE), UKOPA Technical Seminar · UK Onshore Pipeline Operators' Association (UKOPA), slides by UK Health and Safety Executive ·
- 4.Design Codes: Plant (COMAH Technical Measures Document) · UK Health and Safety Executive (HSE) ·
- 5.Corrosion / selection of materials (COMAH Technical Measures Document) · UK Health and Safety Executive (HSE) ·
- 6.Final Investigation Report: Chevron Richmond Refinery Pipe Rupture and Fire (Report No. 2012-03-I-CA) · US Chemical Safety and Hazard Investigation Board (CSB) ·
- 7.Ageing and life extension of offshore installations · UK Health and Safety Executive (HSE)
- 8.Process Safety Management for Petroleum Refineries: Lessons Learned from the Petroleum Refinery Process Safety Management National Emphasis Program (OSHA 3918) · US Occupational Safety and Health Administration (OSHA)