What is mechanical integrity (MI)?

·7 sources

Short answer

Mechanical integrity (MI) is the program that keeps process equipment, from vessels and piping to relief devices and pumps, fit for service. It rests on written procedures, training, inspection and testing, correction of deficiencies and quality assurance. In the US it is part (j) of the Occupational Safety and Health Administration (OSHA) process safety rule, 29 CFR 1910.119.

By , Editor·Researched and drafted by ·Checked by , Editor·Last checked ·Next review

Why does it matter?

In refinery inspections under a national emphasis program launched in June 2007, OSHA found that failing to correct equipment deficiencies outside acceptable limits was one of the leading causes of process safety management (PSM) non-compliance 2. Inspection finds problems, but the rule also requires fixing them 1. Relief devices were cited most often, with piping circuits, pressure vessels and alarm systems next 2. In one case cited, a leaking elbow in a hydrogen sulfide waste gas line stayed in service under an engineered clamp 2.

What equipment does mechanical integrity cover?

The OSHA rule names six groups: pressure vessels and storage tanks; piping systems, including valves; relief and vent systems; emergency shutdown systems; controls, including sensors, alarms and interlocks; and pumps 1. OSHA's process safety guide describes the aim as making sure critical equipment is designed and installed correctly and works properly 7.

OSHA's compliance guidance adds fire protection components, and calls a ranked list of equipment the first step of an MI program, so that items needing closer scrutiny stand out 1. It frames MI as protecting the lines of defense: keeping chemicals contained and venting them safely first, then fire protection, dikes and drainage if a release happens 1.

What does PSM mechanical integrity require?

Paragraph of 29 CFR 1910.119RequirementIn practice
(j)(1) ApplicationCovers the six equipment groups 1The equipment list is the starting point 1
(j)(2) Written proceduresWritten procedures that keep process equipment sound over time 1OSHA cited procedures that did not set the number and location of thickness measurement points 2
(j)(3) TrainingMaintenance staff learn the process, its hazards and their own procedures 1Applies to each employee who maintains process equipment 1
(j)(4) Inspection and testingFollows recognized and generally accepted good engineering practice (RAGAGEP); frequency set by maker advice and good practice, more often if experience demands; each test recorded with date, person, equipment identifier, description and result 1Codes from the American Petroleum Institute (API), such as API 510, API 570 and API 580, are examples of inspection RAGAGEP for vessels and piping 2
(j)(5) Equipment deficienciesDeficiencies outside limits in the process safety information are corrected before further use, or in a safe and timely way with interim measures 1One of the leading causes of refinery non-compliance 2
(j)(6) Quality assuranceNew equipment suits the process as fabricated and is installed to design; spare parts and materials suit the process 1As-built drawings, certifications and materials records are kept, and gaskets, bolts and welding rods are checked in the field 1

What do inspectors most often find?

OSHA's 2017 summary of its refinery program lists recurring MI gaps 2:

  • Uncorrected deficiencies in four groups: missing maintenance or repair, wrong installation such as incorrect sizing, missing protective systems such as relief devices, and weak structural support. 2
  • Incomplete procedures that did not fix thickness measurement locations or say how to handle anomalous data, such as wall readings that increase over time. 2
  • Corrosion rates not calculated to set inspection intervals, or measured rates above the expected rate left unaddressed. 2
  • Corrosion under insulation not inspected in a sulfur unit. 2
  • Generic procedures that missed site equipment; in one plant, hydrogen sulfide monitors and alarms were checked only after they malfunctioned. 2

Which other rules require mechanical integrity?

RuleApplies toHow it differs from OSHA (j)
Environmental Protection Agency (EPA), 40 CFR 68.73Program 3 processes under the Risk Management ProgramSame six requirements and equipment groups 3
Bureau of Safety and Environmental Enforcement (BSEE), 30 CFR 250.1916US offshore operations under safety and environmental management systems (SEMS)Covers all equipment that prevents or mitigates uncontrolled releases, from design and procurement to modification; deficiencies beyond the maker's limits are corrected before further use; records carry the inspector's position and signature 4
California, 8 CCR 5189.1(j)Petroleum refineries in CaliforniaInspection procedures must meet or exceed RAGAGEP, and the employer needs a process to evaluate new or updated codes and standards 5

Where integrity problems show up

DecisionData it depends onWhat goes wrong without itIn the Library
Putting equipment in the MI programPiping and instrumentation diagrams and equipment listsGas monitors, flow and level alarms were inspected only when they failed 2What should an inspection plan contain?
Setting thickness measurement locations and intervalsCorrosion rates and susceptible spots such as injection points, mixing points and dead legsCorrosion rates were not calculated, and rates above expectation went unaddressed 2What are condition monitoring locations (CMLs)?
Resolving anomalous readingsThickness history at each locationIncreasing wall readings were not investigated 2What is an inspection data management system (IDMS)?
Inspecting insulated equipmentInsulation condition and temperature cyclingSulfur unit vessels and piping had no inspection for corrosion under insulation 2What is corrosion under insulation (CUI)?
Re-checking old equipment when practice changesNew industry findings and material recordsIn Philadelphia in 2019, an elbow with high nickel and copper thinned in hydrofluoric acid service to 0.011 in (0.28 mm) and ruptured; industry guidance changed after 2003 research, but inspecting every component of existing circuits was not required 6What is RAGAGEP (recognized and generally accepted good engineering practice)?

Sources: OSHA 3918, 2017 2; CSB report 2019-04-I-PA, 2022 6.

Common questions

Is mechanical integrity the same as asset integrity management?
No. MI is the equipment element of OSHA's process safety rule. Asset integrity management is broader, covering the whole asset life and other regimes such as pipeline and offshore rules; see [What is asset integrity management in oil and gas?](/library/asset-integrity-management/).
How often must equipment be inspected under PSM?
The rule sets no fixed interval: frequency follows maker advice and good engineering practice, and increases if operating experience shows it is needed. OSHA's guidance notes that inspection codes base the frequency on the corrosion rate. See [How are inspection intervals set for vessels, piping and tanks?](/library/inspection-intervals/).
Does mechanical integrity cover new equipment?
Yes. Quality assurance requires new equipment to suit the process as fabricated and to be installed to design specifications and maker instructions.

Beacon explains these concepts in its own words for education. It does not reproduce or replace the standards cited, and Winda is not affiliated with or endorsed by the organizations that publish them. Engineering decisions need the current edition of the standard and a qualified engineer.

Sources

  1. 1.29 CFR 1910.119, Process safety management of highly hazardous chemicals (paragraphs (d) and (j), and Appendix C) · eCFR, US Office of the Federal Register
  2. 2.Process Safety Management for Petroleum Refineries: Lessons Learned from the Petroleum Refinery Process Safety Management National Emphasis Program (OSHA 3918-08) · US Occupational Safety and Health Administration (OSHA)
  3. 3.40 CFR 68.73, Mechanical integrity · eCFR, US Office of the Federal Register
  4. 4.30 CFR 250.1916, What criteria for mechanical integrity must my SEMS program meet? · eCFR, US Office of the Federal Register
  5. 5.California Code of Regulations, Title 8, Section 5189.1, Process Safety Management for Petroleum Refineries (subsection (j), Mechanical Integrity) · California Department of Industrial Relations (Cal/OSHA)
  6. 6.Investigation Report: Fire and Explosions at Philadelphia Energy Solutions Refinery Hydrofluoric Acid Alkylation Unit (No. 2019-04-I-PA) · US Chemical Safety and Hazard Investigation Board (CSB) ·
  7. 7.Process Safety Management (OSHA 3132) · US Occupational Safety and Health Administration (OSHA)