Short answer

A risk matrix is a grid with probability (likelihood) of failure on one axis and consequence of failure on the other, so that each item's risk level is read from the cell where its two ratings meet.

By , Editor·Researched and drafted by ·Checked by , Editor·Last checked

In risk-based inspection and maintenance, likelihood and consequence can each be given a rating, a frequency index and a severity index, in place of a calculated value; a 2026 open-access study notes that a risk matrix is often used to show the result, with consequence along the horizontal axis and likelihood up the vertical one 1. Items that land outside the plant's risk acceptance criteria are the ones that go into the maintenance or inspection plan 1.

It is a chart that shows which equipment needs attention first 1.

Bands are coarser than numbers. A 1992 Pacific Northwest Laboratory paper suggested that whole plant systems might reasonably be sorted into high, medium and low risk importance, but it used a numerical estimate, probability multiplied by consequence, to compare single components across systems 2. A matrix is also a snapshot: the 2026 study notes that its own ranking assumed constant failure rates, although corrosion, fatigue and similar damage usually make failure more likely as equipment ages 1.

See alsoProbability of failureConsequence of failure

Sources

  1. 1.Toward the application of the Risk-Based Maintenance approach to a hydrogen-fueled manufacturing plant (G. Collina and others), International Journal of Hydrogen Energy 238, 155318, open access under CC BY 4.0 · Elsevier, via OSTI.gov (co-authored by the US National Laboratory of the Rockies)
  2. 2.Risk Based ASME Code Requirements (B. F. Gore, T. V. Vo, K. R. Balkey), PNL-SA-21211, OSTI 7129942 · Pacific Northwest Laboratory, US Department of Energy, via OSTI.gov