Risk target

·5 sources

Short answer

A risk target is the level of risk that an owner or a regulator sets as the line a piece of equipment or a system should stay under.

By , Editor·Researched and drafted by ·Checked by , Editor·Last checked

Inspection and other measures are then planned so that the estimated risk does not cross it. A 1992 US national laboratory paper on risk-based inspection of nuclear plant components framed it as the answer to the question of how much inspection is enough: a total target risk is shared out among components, and inspection has to keep each component's probability of rupture below its share 1. API's catalog entry for API RP 581 says an inspection is recommended as risk approaches a risk tolerance or risk target 2.

It is the line on the risk scale that triggers action. It is a choice about acceptable risk, not a measured limit such as a minimum wall thickness 1.

Who sets the line differs 3,4,5:

  • Operators. Pipeline operators told the US National Transportation Safety Board (NTSB) that the ability to set a target risk level is one advantage of probabilistic risk models 3.
  • US process safety rules. The US Chemical Safety and Hazard Investigation Board (CSB) noted that the US process safety management and risk management program rules do not require risk to be reduced to a specific target such as ALARP, as low as reasonably practicable 4.
  • A regulator's numbers. For land-use planning advice around major hazard sites, the UK Health and Safety Executive (HSE) draws contours at individual risk levels of 10, 1 and 0.3 chances per million per year of receiving a dangerous dose 5. These are planning levels, not inspection targets.

See alsoRisk matrixProbability of failure

Sources

  1. 1.Risk Based ASME Code Requirements (B. F. Gore, T. V. Vo, K. R. Balkey), PNL-SA-21211, OSTI 7129942 · Pacific Northwest Laboratory, US Department of Energy, via OSTI.gov
  2. 2.2025 Publications Catalog (entry for API RP 581) · American Petroleum Institute (API)
  3. 3.Integrity Management of Gas Transmission Pipelines in High Consequence Areas, Safety Study NTSB/SS-15/01 · US National Transportation Safety Board (NTSB)
  4. 4.Investigation Report: Catastrophic Rupture of Heat Exchanger (Seven Fatalities), Tesoro Anacortes Refinery, Anacortes, Washington, April 2, 2010, Report 2010-08-I-WA · US Chemical Safety and Hazard Investigation Board (CSB)
  5. 5.HSE's land use planning methodology · UK Health and Safety Executive (HSE)