What is an asset register and what data should it hold?

·11 sources

Short answer

An asset register is a structured list of an owner's physical assets, recording what each is, where it is, its condition, remaining useful life and value. In a process plant it ties each design tag to the equipment actually installed, so inspection, test and maintenance records attach to the right item.

By , Editor·Researched and drafted by ·Checked by , Editor·Last checked ·Next review

Why does it matter?

Before a gas transmission pipeline ruptured in San Bruno, California, in 2010, the operator's records described the failed segment as seamless pipe, an entry traced to a 1956 accounting voucher; investigators found short welded pieces, one with a partly welded seam where the fracture began 3. Eight people died and 38 homes were destroyed, and the National Transportation Safety Board (NTSB) found that the operator's integrity management program rested on incomplete and inaccurate pipeline information 3. Under a federal rule added in 2019, onshore steel gas transmission operators, where the pipeline code calls for it, must keep records of pipe diameter, wall thickness, seam type and grade for the pipeline's life, and test the pipe when those records are not traceable, verifiable and complete 4.

What is an asset register?

The US Environmental Protection Agency (EPA) describes asset management as keeping a desired level of service at the lowest life cycle cost 1. Its first step is knowing the current state of the assets: what the owner has, where each item is, its condition, its useful life and its value, recorded in an asset inventory and system map 1. EPA lists building that inventory alongside scheduling maintenance through work orders and managing budgets 2. This page calls that inventory an asset register.

In process plants a register usually separates two things. The CFIHOS handover specification defines a tag as a function at a numbered position in the plant, with function-related properties, and equipment as the physical item filling it, with properties such as serial number, manufacturer and purchase date 5. Items can be swapped on a tag over time, with one installed at a time, so keeping both lets a register show which item held a position on a given date 5.

What data should an asset register hold?

Data groupExamplesUsual source at handoverPublic reference
IdentityTag number, description, equipment classMaster tag registerCFIHOS 5
LocationUnit, area and position; for pipelines, route and facility locationsDrawings and pipeline mapsEPA 1; 49 CFR 195.404(a) 7
Physical itemManufacturer, model, serial number, purchase dateSupplier data; record of installed equipment and materialsCFIHOS 5; UFGS 01 78 00 8
Design and materialsSafe operating limits, design codes, materials of construction, relief design basis; for pipe, diameter, wall thickness, seam type and gradeData sheets, process safety information, material certificates29 CFR 1910.119(d) 6; 49 CFR 192.607(b) 4
Condition and historyInspection and test results, repairs, condition ratingBaseline survey and test records, then in-service inspectionsEPA 1; 29 CFR 1910.119(j)(4)(iv) 6; 49 CFR 195.404(c) 7
Criticality, life and valueHow the item can fail and what failure would cost, remaining useful life, replacement costOwner's assessmentsEPA 1
LinksDrawings, certificates and manuals attached to the tag and itemMaster document registerCFIHOS 5

UFGS: Unified Facilities Guide Specifications for US military construction 8.

EPA describes two ways to build an inventory: looking back at assets already owned, starting with the critical ones, and looking ahead at assets being acquired, where the inventory is tied to commissioning or handover and contract retainage keeps control 2. On a capital project, CFIHOS has owner and contractor share one master tag register throughout and expects the as-built registers to agree with the documents and data at handover 5. The US Army version of the military closeout specification asks the contractor for a record of installed equipment and materials, with manufacturer, model, serial number and where each item is used, because such data is hard to establish once construction is finished 8.

The Occupational Safety and Health Administration's (OSHA) process safety rule then sets much of the scope that matters for integrity: its mechanical integrity element covers pressure vessels and storage tanks, piping systems and valves, relief and vent systems, emergency shutdown systems, controls and pumps 6.

How is the asset register used in operation?

In a process covered by OSHA's rule, each inspection and test record must carry the equipment's serial number or other identifier, together with the date, the inspector, a description and the result 6. OSHA's refinery review found field tags that did not match the piping and instrumentation diagrams (P&IDs), and procedures that did not set thickness measurement locations for each vessel and piping section 9. EPA's framework builds criticality ranking, maintenance scheduling and life cycle cost decisions on the same inventory 1,2. Programs that use this data are covered in What should an inspection plan contain?, What is risk-based inspection (RBI)? and What is asset performance management (APM)?.

Where integrity problems show up

Decision or step at this stageWhat it affects laterIn the Library
Material, grade and seam type entered from engineering recordsAt San Bruno (2010), a pipe description taken from an accounting record was wrong, and the integrity program built on that data did not account for the design and materials riskWhat is material traceability?
One identifier per item, matching the field tag and the P&IDsInspection records must name the equipment's identifier; OSHA cited refineries whose field tags did not match their drawingsWhat should an inspection plan contain?
Criticality fields: how an item can fail and the consequenceEPA ranks critical assets by the likelihood and consequence of failureWhat is risk-based inspection (RBI)?
Pipe grade and toughness kept in traceable recordsCrack and remaining-life analyses of gas transmission pipe must otherwise use conservative assumed toughness valuesWhat is fitness-for-service (API 579-1/ASME FFS-1)?
Measured baseline thickness stored against each monitoring locationCorrosion rates based on nominal instead of measured thickness can carry large errors from mill tolerancesBaseline inspection

Sources: NTSB/PAR-11/01, 2011 3; 29 CFR 1910.119(j)(4)(iv) 6; OSHA 3918, 2017 9; EPA, 2008 1; 49 CFR 192.712 10; AIChE paper abstract, 2011 11.

Common questions

Is an asset register the same as a fixed asset register in accounting?
Not necessarily. Integrity work needs engineering data such as material, grade and seam type. At San Bruno, the pipe description in the operator's records came from a voucher used to move material costs between construction jobs, not from engineering records, and it was wrong.
Who builds the asset register for a new plant?
Usually the project: under CFIHOS, the contractor and suppliers fill in tag and equipment data during design and construction, and the owner takes it over at handover. EPA likewise ties the inventory of newly acquired assets to commissioning or handover.

Beacon explains these concepts in its own words for education. It does not reproduce or replace the standards cited, and Winda is not affiliated with or endorsed by the organizations that publish them. Engineering decisions need the current edition of the standard and a qualified engineer.

Sources

  1. 1.Asset Management: A Best Practices Guide (EPA 816-F-08-014) · US Environmental Protection Agency (EPA), Office of Water; copy hosted by the Nebraska Department of Water, Energy, and Environment
  2. 2.Asset Management 101 (webinar handout) · US Environmental Protection Agency (EPA) ·
  3. 3.Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire, San Bruno, California, September 9, 2010 (NTSB/PAR-11/01) · US National Transportation Safety Board (NTSB)
  4. 4.49 CFR 192.607, Verification of Pipeline Material Properties and Attributes: Onshore steel transmission pipelines · eCFR, US Office of the Federal Register
  5. 5.CFIHOS Scope and Procedures (C-TP-001) (Version 2.0) · JIP36 CFIHOS, International Association of Oil & Gas Producers (IOGP) ·
  6. 6.29 CFR 1910.119, Process safety management of highly hazardous chemicals · eCFR, US Office of the Federal Register
  7. 7.49 CFR 195.404, Maps and records · eCFR, US Office of the Federal Register
  8. 8.UFGS 01 78 00, Closeout Submittals (Unified Facilities Guide Specifications) · US Army Corps of Engineers, Naval Facilities Engineering Systems Command and Air Force Civil Engineer Center, via the Whole Building Design Guide
  9. 9.Process Safety Management for Petroleum Refineries: Lessons Learned from the Petroleum Refinery Process Safety Management National Emphasis Program (OSHA 3918) · US Occupational Safety and Health Administration (OSHA)
  10. 10.49 CFR 192.712, Analysis of predicted failure pressure and critical strain level · eCFR, US Office of the Federal Register
  11. 11.The Importance of Mechanical Integrity Inspection for Successful Capital Projects (paper 84b, abstract), P. F. Schubert · American Institute of Chemical Engineers (AIChE), 2011 Spring Meeting and 7th Global Congress on Process Safety