What is a corrosion risk assessment in FEED?

·9 sources

Short answer

A corrosion risk assessment in front-end engineering design (FEED) predicts the corrosion and cracking each system will face and sets how to control it. Its outputs are materials, corrosion allowances, coatings, cathodic protection, inhibitors and monitoring points. Unlike an operating damage mechanism review, it has no inspection history to draw on.

By , Editor·Researched and drafted by ·Checked by , Editor·Last checked ·Next review

Why does it matter?

The pipe component that ruptured in the 2012 Richmond, California, refinery fire was carbon steel with 0.01% silicon, and the US Chemical Safety and Hazard Investigation Board (CSB) found that carbon steel below 0.10% silicon can thin by sulfidation up to 16 times faster than higher-silicon carbon steel 1. CSB also found that low-silicon parts are hard to find once a plant is built, because every component must be checked, and named steels with at least 9% chromium as the inherently safer choice for that service 1. The UK Health and Safety Executive (HSE) describes corrosion as the biggest single reason process plant and equipment break down, and expects it to be dealt with when the plant is designed as well as during its life 2.

What does a design-stage corrosion risk assessment cover?

Step (Beacon's order)What is decidedPublic anchor
1. Collect process data, including upsetsCompositions, water and contaminants such as chlorides, temperatures, pressures, flow velocitiesHSE: materials must suit the worst foreseeable upset, since composition and temperature swings change corrosion rates 2; OSHA: corrosivity data are part of process safety information 4
2. Identify likely damage mechanisms by systemGeneral and localized corrosion, cracking, erosion, external corrosion including under insulationHSE lists the common mechanisms for vessels 3; California's refinery rule lists six families of damage mechanisms 5
3. Select materialsCarbon steel with an allowance, alloys, linings or non-metallics, for every component including valves, fittings and instrumentsHSE 2; CSB example of chromium steels in sulfidation service 1
4. Set the corrosion allowanceExtra wall thickness for the loss expected over the design lifeHSE: usual practice is a material that corrodes slowly at a known rate, plus an allowance 2,3
5. Choose mitigationCoatings, cathodic protection, chemical inhibitors, drainage and layout details49 CFR 192.455: buried or submerged gas pipelines installed after July 31, 1971 need coating and cathodic protection, the latter within 1 year of construction 6; HSE on inhibitors and drainage 2,3
6. Plan monitoringLocations and devices to check the assumptions in service49 CFR 192.476: new gas transmission lines must allow internal corrosion monitoring where the potential is significant 7
7. Record the basisTraceable data behind each choice, carried into datasheets and process safety informationHSE: sources of corrosion data should be traceable 2; OSHA: materials of construction must be documented 4

On allowances, HSE's plant design guidance states that carbon and low-alloy steels in mildly corrosive service often get about 2 mm, more severe service about 4 mm, and that most design codes set a minimum of 1 mm 3. Where corrosion data do not exist, for example for mixed chemicals, HSE notes that corrosion tests may be needed, and that laboratory results can mislead if trace impurities, dissolved gases or velocity differ from the plant 2.

Who carries it out?

Who leads it depends on the owner and the project, but public rules set a competence floor. For US gas pipelines, corrosion control procedures, including cathodic protection design, must be performed by a person qualified in pipeline corrosion control methods or under that person's direction 8. HSE notes that process engineers often select materials and that specialist materials engineers are brought in for difficult applications 3.

The results become design inputs: material and allowance entries on equipment datasheets and the line list, and the materials of construction recorded in process safety information 4.

How is it different from a damage mechanism review?

Design-stage corrosion risk assessmentOperating damage mechanism review
WhenConcept to detailed design, before the equipment existsIn operation; in California revalidated at least every 5 years and before major changes 5
Main dataExpected process conditions and upsets, published and test dataOperating parameters, inspection history, damage data and industry experience 5
Main outputsMaterials, allowances, mitigation, monitoring locationsConfirmed mechanisms, prevention and mitigation, conditions that speed up damage 5
TeamDesign team with corrosion and materials specialistsEngineering, inspection, damage mechanism and operations expertise, plus a methodology lead 5

Sources: California Code of Regulations, Title 8, Section 5189.1(k) 5; CSB (2015) 1.

The design study sets assumptions; the operating review tests them against what the plant actually does. After the 2012 Richmond fire, CSB recommended that refineries carry out documented damage mechanism hazard reviews as part of each process hazard analysis cycle 1. OSHA's refinery emphasis program, begun in 2007, cited sites where measured corrosion rates exceeded the expected rates without being accounted for 9.

Where integrity problems show up

Decision or step at this stageWhat it affects laterIn the Library
Carbon steel in hot, sulfur-bearing service without silicon controlCorrosion rates that vary from one component to the next 1What is sulfidation (high-temperature sulfur corrosion)?
Austenitic stainless steel where chlorides may be presentCracking; HSE notes that even trace chlorides can cause problems above 60 °C (140 °F) 2What is chloride stress corrosion cracking?
Corrosion allowance from an expected rateThe starting margin for remaining life; actual rates can run higher 3,9Corrosion allowance
Layout without free drainage, or with dead spotsLocalized corrosion where fluid and deposits settle 2,3Dead leg
Insulation that is not weatherproofedCorrosion under insulation; OSHA cited refineries that did not inspect for it 2,9What is corrosion under insulation (CUI)?
Monitoring locations built into new gas transmission linesWhether design assumptions can be checked in service 7What is corrosion monitoring and which methods are used?

Sources: CSB (2015) 1; HSE COMAH technical measures documents (2025) 2,3; OSHA 3918 (2017) 9; 49 CFR 192.476 7.

Common questions

Is a corrosion risk assessment required by law?
There is no single rule, but several require its results. New US gas transmission lines must include design features against internal corrosion, buried gas pipelines need coating and cathodic protection, and HSE expects major hazard sites to show that corrosion and materials were considered at the process design stage.
Does a damage mechanism review replace it?
No. The operating review needs the design study's assumptions and the plant's process safety information as a starting point; California requires that information to exist before the review.

Beacon explains these concepts in its own words for education. It does not reproduce or replace the standards cited, and Winda is not affiliated with or endorsed by the organizations that publish them. Engineering decisions need the current edition of the standard and a qualified engineer.

Sources

  1. 1.Final Investigation Report: Chevron Richmond Refinery Pipe Rupture and Fire (Report No. 2012-03-I-CA) · US Chemical Safety and Hazard Investigation Board (CSB) ·
  2. 2.Corrosion / selection of materials (COMAH Technical Measures Document) · UK Health and Safety Executive (HSE) ·
  3. 3.Design Codes: Plant (COMAH Technical Measures Document) · UK Health and Safety Executive (HSE) ·
  4. 4.29 CFR 1910.119, Process safety management of highly hazardous chemicals · eCFR, US Office of the Federal Register
  5. 5.California Code of Regulations, Title 8, Section 5189.1, Process Safety Management for Petroleum Refineries · California Department of Industrial Relations
  6. 6.49 CFR 192.455, External corrosion control: Buried or submerged pipelines installed after July 31, 1971 · eCFR, US Office of the Federal Register
  7. 7.49 CFR 192.476, Internal corrosion control: Design and construction of transmission line · eCFR, US Office of the Federal Register
  8. 8.49 CFR 192.453, General (corrosion control) · eCFR, US Office of the Federal Register
  9. 9.Process Safety Management for Petroleum Refineries: Lessons Learned from the Petroleum Refinery Process Safety Management National Emphasis Program (OSHA 3918) · US Occupational Safety and Health Administration (OSHA)