API 574 is the American Petroleum Institute's recommended practice (RP) for inspecting piping, valves and fittings in refineries and chemical plants. It also covers tubing, leaves out control valves, and supplements the API 570 code for in-service piping. The current 5th edition was published in February 2024, with Addendum 1 in March 2025.

By , Editor·Researched and drafted by ·Checked by , Editor·Last checked ·Next review

Why does it matter?

In June 2019 a steel elbow in the hydrofluoric acid (HF) alkylation unit of a Philadelphia refinery ruptured, starting fires and explosions; the refinery estimated that 5,239 pounds of HF were released, and an insurance industry report cited by investigators put the property loss at about $750 million 1. The elbow's piping circuit had grown from 41 condition monitoring locations (CMLs) in 2002 to 141 by 2019, but none of them was on the elbow that failed 1. The elbow held high levels of nickel and copper and had thinned much faster than neighboring components, which were not thin 1. Industry practice at the time did not require every carbon steel component in HF service to be inspected; according to the CSB, API RP 751 on HF alkylation was revised after the incident so that each carbon steel component in known corrosion zones is now inspected 1.

What does API 574 cover?

API RP 574, Inspection Practices for Piping System Components, is a recommended practice that API's catalog pairs with the API 570 piping code, as a reference that builds inspectors' working knowledge 2. It deals with the parts that make up refinery and chemical plant piping systems: the pipe and tubing themselves, their fittings, and valves, with control valves left out 2. API announced the 5th edition 3, dated February 2024 2, and its effectivity sheet for 2027 inspector exams lists that edition with Addendum 1 of March 2025 4.

Where does piping deteriorate, and how is it found?

Refineries divide piping into circuits that share process conditions, material and expected damage, and place condition monitoring locations within each circuit where wall thickness is measured over time 1. In the CSB's description, a circuit expected to corrode evenly gets fewer CMLs and one prone to local attack gets more 1.

Location or featureWhy it needs attentionPublic source
Injection points, mixing points and dead legsThe US Occupational Safety and Health Administration (OSHA) points to these spots, where deterioration is likely, as places that need CMLs in addition to readings spread along the line 7OSHA 3918, 2017 7
Dead legs (stagnant branches, relief lines, bypasses)Corrosion can be aggressive and very local; for high-risk dead legs HSE does not consider spot ultrasonic readings adequate and expects a significant share of the line to be tested 5HSE safety alert, 2019 5
Insulated pipingOSHA cited a refinery for not inspecting for corrosion under insulation on piping and vessels in a sulfur unit 7OSHA 3918, 2017 7
Components with different chemistryHigh nickel and copper steel corrodes faster in HF service 1; low-silicon carbon steel corrodes faster in hot sulfur service 6CSB, 2022 and 2015 1,6

How does API 574 relate to API 570 and to regulators?

API 570 (5th edition, February 2024) is the code that governs metal piping in service, from its inspection program to its repairs 2,4. RP 574 is a supporting practice, not a code 2. In the US, the process safety rule requires piping inspection to meet recognized and generally accepted good engineering practice (RAGAGEP) 8, and OSHA names API publications as examples 7. In the UK, HSE regards API 570, RP 574 and Energy Institute guidance as relevant good practice for reducing pipework risk on major hazard sites 5.

After the 2012 Richmond, California, refinery fire, the CSB recommended that API revise RP 574, then in its 3rd edition, to adopt the sulfidation guideline RP 939-C as a normative reference and to follow a leak response protocol 6.

Where integrity problems show up

What it finds wellWhat it can miss or get wrongIn the Library
Thickness readings at CMLs track general wall loss across a circuit 1One component corroding faster than its circuit: the Philadelphia elbow had no CML 1What are condition monitoring locations (CMLs)? · Corrosion circuit
Spot ultrasonic checks at fixed points 5Local thinning between points: the 8-inch UK relief line that ruptured in 2019 was tested at four locations, none near the failure, and released about 75 tonnes of flammable material 5Dead leg · How does ultrasonic thickness measurement work?
Remaining-life forecasts from thickness data 6Readings taken historically on high-silicon fittings at Richmond suggested the line could run until 2016; a low-silicon component failed in August 2012 6What is sulfidation (high-temperature sulfur corrosion)? · Remaining life
Inspection of exposed piping surfacesCorrosion under insulation when insulated lines are not included 7What is corrosion under insulation (CUI)?

Sources: CSB reports on Philadelphia (2022) 1 and Richmond (2015) 6; HSE safety alert CEMHD2-2019 5; OSHA 3918 7.

Common questions

What is the difference between API 570 and API 574?
API 570 is the inspection code with requirements for in-service piping; RP 574 is a recommended practice describing how piping components are inspected in support of it.
Does API 574 apply to pipelines?
No. Its scope is piping, tubing, valves and fittings in refineries and chemical plants. US hazardous liquid pipelines in high consequence areas follow federal integrity management rules, such as 49 CFR 195.452.
What does the CSB say about RP 574's default thicknesses?
The CSB found that if the Richmond refinery had used the RP 574 default minimum structural thickness for the line that failed, its predicted remaining life would have been under ten years, which should have triggered a discussion of replacement.

Beacon explains these concepts in its own words for education. It does not reproduce or replace the standards cited, and Winda is not affiliated with or endorsed by the organizations that publish them. Engineering decisions need the current edition of the standard and a qualified engineer.

Sources

  1. 1.Investigation Report: Fire and Explosions at Philadelphia Energy Solutions Refinery Hydrofluoric Acid Alkylation Unit, Report No. 2019-04-I-PA · US Chemical Safety and Hazard Investigation Board (CSB) ·
  2. 2.2025 Publications Catalog (entries for API 570 and RP 574) (RP 574, 5th edition, February 2024; API 570, 5th edition, February 2024) · American Petroleum Institute (API)
  3. 4.API 570 Exam Publications Effectivity Sheet for February 2027 and June 2027 (RP 574, 5th edition, February 2024, Addendum 1 (March 2025)) · American Petroleum Institute (API)
  4. 5.Catastrophic rupture of dead-leg pipe-work (Safety alert, Bulletin No. CEMHD2-2019) · UK Health and Safety Executive (HSE) ·
  5. 6.Final Investigation Report: Chevron Richmond Refinery Pipe Rupture and Fire, Report No. 2012-03-I-CA · US Chemical Safety and Hazard Investigation Board (CSB) ·
  6. 7.Process Safety Management for Petroleum Refineries: Lessons Learned from the Petroleum Refinery Process Safety Management National Emphasis Program (OSHA 3918) · US Occupational Safety and Health Administration (OSHA)
  7. 8.29 CFR 1910.119, Process safety management of highly hazardous chemicals · eCFR, US Office of the Federal Register