How are inspection intervals set for vessels, piping and tanks?

·12 sources

Short answer

An inspection interval is the longest time allowed between two inspections of a pressure vessel, piping circuit or storage tank. It is set from code and legal limits, the measured corrosion rate and remaining life, and risk. US process safety rules (29 CFR 1910.119(j)) require frequencies that follow good engineering practice and shorten them when experience demands.

By , Editor·Researched and drafted by ·Checked by , Editor·Last checked ·Next review

Why does it matter?

A calendar interval taken from a code is not the whole answer. US process safety rules tie inspection frequency to manufacturers' recommendations and good engineering practice, and require more frequent inspection where prior operating experience shows the need 1. In its 2017 review of refinery inspections, the US Occupational Safety and Health Administration (OSHA) found that piping circuits were the equipment most often cited for unacceptable or missing inspection frequencies, followed by pressure vessels, relief devices and monitoring alarms 2. Citations included corrosion rates above the expected rate that were left uncorrected, and failure to calculate corrosion rates to set thickness measurement intervals 2.

What are the three ways intervals are set?

ApproachHow the interval is decidedData it needsPublic example
Time-basedA fixed period for a class of equipmentEquipment type and serviceVirginia requires a certificate inspection of pressure vessels every two years 5; earlier British law fixed periods for some equipment, usually 14 months for steam plant 3
Condition-basedFrom the measured rate of deterioration, so the next inspection falls before the remaining margin is used upRepeat thickness readings, corrosion rate, minimum allowed thicknessAt Richmond, thickness data from a turnaround were used to forecast when a line would reach its alert thickness 6
Risk-basedFrom the likelihood and consequence of failure, inspecting before an accepted risk limit is crossedDamage mechanisms and rates, past inspection quality, consequencesThe UK Health and Safety Executive (HSE) accepts different intervals for different parts of a system according to risk 3; for oil storage tanks, guidance from the US Environmental Protection Agency (EPA) notes that API 653 lets the interval come from a risk-based assessment instead of the corrosion rate 10

In practice the three are combined. For refinery piping, OSHA explains that the piping code groups lines into service classes with maximum thickness measurement intervals, and that the inspector or piping engineer sets each interval within those limits 2. Beacon does not reproduce the codes' interval limits; the code pages API 510, API 570 and API 653 describe their scope.

Who decides, and on what evidence?

  • US process plants. The employer, through written mechanical integrity procedures that follow recognized and generally accepted good engineering practice 1; OSHA lists the equipment manufacturer, company procedures and consensus standards as sources for frequencies 2.
  • US states. Virginia fixes the period for most vessels but lets approved owner-user inspection agencies agree intervals with the state, and lets the commissioner vary requirements on documented service conditions 5.
  • US oil storage. The Environmental Protection Agency's spill prevention rule requires each aboveground container to be tested or inspected on a regular schedule, with frequency and type chosen from industry standards according to the container's size, configuration and design, plus frequent external checks 4.
  • UK pressure systems. A competent person sets the nature and frequency of examination in a written scheme 3. HSE lists the factors: the system's safety record and history, general information on that type of equipment, its current condition including internal and external corrosion or erosion, how hard it will be operated, fluid quality, the standard of supervision, maintenance and inspection, and whether on-stream monitoring is available 3.

When is an interval shortened, reviewed or postponed?

HSE expects the written scheme to be reviewed from time to time, ideally after each examination, and notes that ageing plant may need more frequent examination 3. In its 2014 report on offshore ageing and life extension, HSE called for inspection schedules shown to be suitable for ageing installations 9.

Postponing is a separate, narrow step. Each UK examination report sets a date after which the system may not run without a further examination. That date may be moved only by written agreement between the user or owner and the competent person who wrote the report, only once for any examination, only where the delay creates no danger, and only after written notice to the enforcing authority before the date arrives 7,3.

Pipelines follow fixed outer limits written into federal rules. Hazardous liquid lines that could affect high consequence areas are reassessed on five-year cycles of no more than 68 months, with the order and timing based on the risk each line poses 11. Gas transmission segments in integrity programs have a maximum reassessment interval of 7 calendar years, with a 6-month extension possible for an operator that gives written notice and justification to the federal Office of Pipeline Safety 12.

An interval protects only against the damage it was built for: at Anacortes, Washington, the heat exchangers that ruptured in 2010 had never been inspected for high temperature hydrogen attack (HTHA), because reviews used design data instead of measured conditions 8.

Where integrity problems show up

What it finds wellWhat it can miss or get wrongIn the Library
Fixed calendar intervals give every item a regular check 5Faster-than-expected corrosion: OSHA cited corrosion rates above the expected rate that were not acted on 2Risk-based inspection vs time-based inspection
Condition-based intervals follow measured wall loss 2,6Readings in the wrong places: at Richmond, data from high-silicon fittings forecast safe operation until 2016, but a low-silicon component ruptured in August 2012 6Remaining life · Corrosion rate and remaining life calculator
Risk-based intervals focus effort where risk is highest 3Damage left out of the analysis gets no inspection, as with HTHA at Anacortes, and CSB judged inspection for that damage not reliable enough to depend on 8What is risk-based inspection (RBI)? · What are integrity operating windows (IOWs)?

Sources: OSHA 3918, 2017 2; US Chemical Safety and Hazard Investigation Board (CSB) reports on Richmond (2015) 6 and Anacortes (2014) 8; PSSR regulation 9 7.

Common questions

Is an inspection interval the same as the next inspection date?
No. The interval is the maximum span allowed by the scheme or program; under UK pressure systems law each examination report sets the date, within that span, after which the system may not run without a further examination.
Are pipeline reassessment intervals set the same way?
Federal pipeline rules write the limits into law. Hazardous liquid lines that could affect high consequence areas are reassessed at five-year intervals not exceeding 68 months, prioritized by risk; gas transmission segments operating at or above 30% of specified minimum yield strength have a maximum reassessment interval of 7 calendar years.
Can inspections be deferred to the next shutdown?
Sometimes, and within limits. Under UK pressure systems law the date for the next examination can be put back once, by written agreement with the competent person, if that creates no danger and the enforcing authority is told in writing before the date falls due.

Beacon explains these concepts in its own words for education. It does not reproduce or replace the standards cited, and Winda is not affiliated with or endorsed by the organizations that publish them. Engineering decisions need the current edition of the standard and a qualified engineer.

Sources

  1. 1.29 CFR 1910.119, Process safety management of highly hazardous chemicals · eCFR, US Office of the Federal Register
  2. 2.Process Safety Management for Petroleum Refineries: Lessons Learned from the Petroleum Refinery Process Safety Management National Emphasis Program (OSHA 3918) · US Occupational Safety and Health Administration (OSHA)
  3. 3.Safety of pressure systems: Pressure Systems Safety Regulations 2000, Approved Code of Practice and guidance (L122, second edition) · UK Health and Safety Executive (HSE)
  4. 4.40 CFR 112.8, Spill Prevention, Control, and Countermeasure Plan requirements for onshore facilities · eCFR, US Office of the Federal Register
  5. 5.16VAC25-50, Boiler and Pressure Vessel Regulations (16VAC25-50-30 and -120) · Virginia Administrative Code, Virginia General Assembly
  6. 6.Final Investigation Report: Chevron Richmond Refinery Pipe Rupture and Fire, Report No. 2012-03-I-CA · US Chemical Safety and Hazard Investigation Board (CSB) ·
  7. 7.The Pressure Systems Safety Regulations 2000 (SI 2000/128), regulation 9 · legislation.gov.uk, The National Archives (UK)
  8. 8.Investigation Report: Catastrophic Rupture of Heat Exchanger (Seven Fatalities), Tesoro Anacortes Refinery, Report No. 2010-08-I-WA · US Chemical Safety and Hazard Investigation Board (CSB)
  9. 9.Key Programme 4 (KP4): Ageing and life extension programme · UK Health and Safety Executive (HSE), Energy Division
  10. 10.SPCC Guidance for Regional Inspectors, Chapter 7: Inspection, Evaluation, and Testing · US Environmental Protection Agency (EPA) ·
  11. 11.49 CFR 195.452, Pipeline integrity management in high consequence areas · eCFR, US Office of the Federal Register
  12. 12.49 CFR 192.939, What are the required reassessment intervals? · eCFR, US Office of the Federal Register