Materials for oil and gas equipment are selected by matching the service conditions to each candidate's strength, toughness and corrosion resistance. Conditions include pressure, temperature, fluid chemistry and foreseeable upsets; cost, fabrication and verification also count. US pipeline rules (49 CFR 192.53) and OSHA process safety rules require materials suited to the service.
By Jun Zhong, Editor·Researched and drafted by Beacon's AI newsroom·Checked by Jun Zhong, Editor·Last checked ·Next review
Why does it matter?
At a refinery in Texas City, Texas, in 2005, a carbon steel elbow ruptured after about 3 months in high-pressure, high-temperature hydrogen service, where the design called for 1.25% chromium low-alloy steel; the hydrogen fire caused a reported $30 million in property damage 1. The elbows had been made dimensionally identical, the two steels look alike, and the swap during maintenance went unnoticed until the failure 1. The US Chemical Safety Board (CSB) concluded that designers should consider the whole life cycle, including maintenance, so critical alloy parts cannot be interchanged with incompatible ones 1.
What information does material selection start from?
The starting point is the service over the design life. The UK Health and Safety Executive (HSE) states that the choice should reflect the worst conditions in foreseeable upsets, cover every component down to valves, instruments and gauges, and allow for shifts in composition (chlorides, moisture) and temperature, which can sharply change corrosion rates 5.
US pipeline rules put this in law. Gas pipeline materials must keep their integrity under the expected temperatures and environment, be chemically compatible with the gas and adjoining materials, and be qualified 2. New hazardous liquid pipe must be carbon, low-alloy high-strength or alloy steel able to carry the expected pressure and loads, made to a written specification 3.
A 1990 assessment by the US National Institute of Standards and Technology (NIST) noted that a fluid's corrosiveness may not be fully passed on to the designer, and listed wrong selection and mistaken identification of materials among construction-stage conditions behind later failures 6.
What are the steps of material selection?
| Step | What is decided | Where it is recorded |
|---|---|---|
| 1. Define the service | Pressure, temperature, loads, fluids (water, H2S, CO2, chlorides, oxygen), upsets, design life 5 | Design basis |
| 2. Identify damage mechanisms | Which forms of corrosion and cracking the service can cause 5,6 | Damage mechanism review |
| 3. Shortlist options | Carbon steel with a corrosion allowance, inhibitors, coatings or cathodic protection, or an alloy, cladding, lining or non-metallic 5 | Candidate list |
| 5. Verify and record | That what is built matches the specification 4,9 | Process safety information, material certificates |
Sources: HSE, 2025 5; NIST SP 780, 1990 6; 29 CFR 1910.119 4; API catalog, 2025 9.
Which material families are used, and where?
| Family | Typical use | Main limit |
|---|---|---|
| Carbon steel | Amine, deaerator and ammonia storage vessels are usually carbon steel grades 8; carbon-manganese plate such as SA-516 Grade 70 is common for vessels 6 | Corrodes in water; cracks at welds in some services 8 |
| Low-alloy chromium-molybdenum steel | Hot hydrogen piping (1.25% chromium in the 2005 case) 1; at least 9% chromium is inherently safer in hot sulfur service 7 | Looks the same as carbon steel 1 |
| Stainless steels and other alloys | Where general corrosion would be severe 6; solid and clad line pipe 9 | Chloride stress corrosion cracking 5 |
| Non-metallic and lined equipment | Duties where metals are unsuitable, such as some salt solutions 5 | Moderate temperatures only; poor in abrasive duty 5 |
Fully resistant materials are often too costly, so the usual approach is a slowly corroding material plus a thickness allowance 5. See Carbon steel vs stainless steel in process service and What are corrosion-resistant alloys (CRAs)?.
Which rules and standards apply?
- OSHA process safety management, 29 CFR 1910.119. Materials of construction are required process safety information; equipment must suit the process as fabricated, be installed as designed and be maintained with suitable parts 4.
- PHMSA pipeline rules, 49 CFR 192 and 195. The requirements above, plus life-of-pipeline records of pipe properties for gas transmission lines installed after 1 July 2020 2,3,12.
- NACE MR0175/ISO 15156 for cracking resistance in H2S-containing production environments 11; see What is NACE MR0175/ISO 15156?.
- ISO 21457, described in a 2013 AMPP paper as the only ISO standard on materials selection for upstream oil and gas 10.
- API RP 578 (4th edition, February 2023), on material verification programs using positive material identification (PMI) 9.
How is the selected material verified?
The CSB found that a handheld X-ray fluorescence instrument quickly tells carbon steel from alloy steel, and recommended PMI for critical alloy parts removed and reinstalled during maintenance 1. Its report on the 2012 Richmond, California, refinery fire noted that portable PMI readily checks chromium content, unlike the silicon content that governs sulfidation of carbon steel 7.
Where integrity problems show up
| Decision or step at this stage | What it affects later | In the Library |
|---|---|---|
| Setting the corrosion allowance from an expected rate | The starting margin for remaining life; localized corrosion can fail equipment far sooner than uniform thinning predicts 5 | Corrosion allowance |
| Ignoring trace chlorides and temperature excursions | Stress corrosion cracking of austenitic stainless piping 5 | What is chloride stress corrosion cracking? |
| Leaving dead spots and crevices in the layout | Local corrosion; HSE calls for full drainage and no dead spots 5 | Dead leg |
| Accepting carbon steel of unknown silicon content in hot sulfur service | Corrosion rates that vary within one circuit; the failed 2012 Richmond component was low-silicon 7 | What is sulfidation? |
| Making alloy and carbon steel parts interchangeable without PMI | Wrong material installed; high temperature hydrogen attack and rupture 1 | What is high temperature hydrogen attack (HTHA)? |
| Not keeping material records | Gas transmission operators without traceable, verifiable and complete records must verify properties by testing 13 | What is material traceability? |
Sources: CSB, 2006 1; HSE, 2025 5; CSB, 2015 7; 49 CFR 192.607 13.
Common questions
- Is material selection the same as choosing a corrosion allowance?
- No. The allowance is one result of selection: HSE describes the usual practice as choosing a material that corrodes slowly at a known rate and adding thickness for it.
- Who selects materials on a project?
- No single role. Designers make the choice, but they depend on being told how corrosive the fluids are, which a 1990 NIST assessment found is not always fully done, and the CSB's Texas City bulletin shows that maintenance must keep the specified alloy in place.
- Is NACE MR0175 a material selection standard?
- Only for resistance to H2S cracking in production and gas sweetening equipment; other damage needs its own assessment.
Beacon explains these concepts in its own words for education. It does not reproduce or replace the standards cited, and Winda is not affiliated with or endorsed by the organizations that publish them. Engineering decisions need the current edition of the standard and a qualified engineer.
Sources
- 1.Safety Bulletin No. 2005-04-B, BP Texas City, TX Refinery Fire: Positive Material Verification: Prevent Errors During Alloy Steel Systems Maintenance · US Chemical Safety and Hazard Investigation Board (CSB) ·
- 2.49 CFR 192.53, General (materials) · eCFR, US Office of the Federal Register
- 3.49 CFR 195.112, New pipe · eCFR, US Office of the Federal Register
- 4.29 CFR 1910.119, Process safety management of highly hazardous chemicals · eCFR, US Office of the Federal Register
- 5.Corrosion / selection of materials (COMAH technical measures) · UK Health and Safety Executive (HSE)
- 6.NIST Special Publication 780, Guidelines for Pressure Vessel Safety Assessment (S. Yukawa) · US National Institute of Standards and Technology (NIST)
- 7.Final Investigation Report: Chevron Richmond Refinery Pipe Rupture and Fire · US Chemical Safety and Hazard Investigation Board (CSB) ·
- 8.OSHA Technical Manual, Section IV, Chapter 3: Pressure Vessel Guidelines · US Occupational Safety and Health Administration (OSHA)
- 9.2025 Publications Catalog (entries for RP 578, Spec 5LC, Spec 5LD) · American Petroleum Institute (API)
- 10.Materials Selection for Oil and Gas Production Systems: Use of ISO 21457 (S. Olsen, store page with abstract) · Association for Materials Protection and Performance (AMPP)
- 11.ISO 15156-1:2020 (standard page) (4th edition, 2020) · International Organization for Standardization (ISO)
- 12.49 CFR 192.67, Records: Material properties · eCFR, US Office of the Federal Register
- 13.49 CFR 192.607, Verification of pipeline material properties and attributes: Onshore steel transmission pipelines · eCFR, US Office of the Federal Register